My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-113
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:22:43 PM
Creation date
10/1/2015 2:37:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
05/17/2011
Control Number
2011-113
Agenda Item Number
8.C.
Entity Name
G.K. Environmental
Subject
Oslo Boat Ramp Amendment No.2 to Work Order No. 1
Area
Oslo Boat Ramp
Project Number
0381
Supplemental fields
SmeadsoftID
9912
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> Amendment No . 2 to Work Order No . 1 <br /> May 17 , 2011 BCC Agenda <br /> Page 2 of 4 <br /> TASK IV — Revised Mitigation Plan <br /> (revised for retention pond relocation and new compliance ACOE regulations) <br /> ( $ 29640 . 00 ) <br /> PHASE IV : CONSULTANT will meet with COUNTY and permit agency staff to finalize mitigation <br /> plan and inspect mitigation sites for compatibility and prepare a revised draft mitigation <br /> plan , based upon the ecological values of wetland impacts . This revised plan will be <br /> based on recent reduction in wetland impacts and field/office meetings with the ACOE / <br /> SJRWMD . Boat trip to mitigation sites for ACOE / SJRWMD will be provided to inspect <br /> site . <br /> TASK V — Revise Uniform Mitigation Assessment Method ( UMAM ) <br /> ( $ 440 . 00 ) <br /> PHASE V : CONSULTANT will conduct a Uniform Mitigation Assessment Method ( UMAM ) and/or a <br /> Wetland Rapid Assessment Procedure (WRAP ) of the wetlands located within the <br /> boundaries of the project site . UMAM/WRAP determines a numerical value for the <br /> ecological functions and ecological values of the existing wetlands and mitigation site . <br /> The UMAMANRAP score can be used to determine what type / amount of mitigation will <br /> be required for the project site . The UMAM/WRAP score is based on vegetation , wildlife <br /> usage , hydrology , soils , water quality , success factor, and adjacent property . These <br /> scores will be reviewed with both the ACOE and SJRWMD . <br /> TASK VII — Revised Vegetation Survey ( FLUCCS ) — ACOE Requirement with new plan <br /> ( $ 440 . 00 ) <br /> PHASE VII : CONSULTANT will conduct a systematic survey of vegetation using the Florida Land <br /> Use, Cover and Classification System (FLUCCS), A Technical Report. FLUCCS was <br /> developed by the State of Florida , Department of Administration , Division of State <br /> Planning , Bureau of Comprehensive Planning , April 1976 . CONSULTANT ecologist <br /> will base the vegetative community descriptions upon field survey observations , SCS <br /> soil maps , aerial photograph interpretation , and site inspections . <br /> TASK IX — Response to Agency Requests for Additional Information ( RAI ) <br /> ( $ 29640 . 00 ) <br /> PHASE IX : Following agency permit application review of additional information and revised <br /> drawings , CONSULTANT will meet with County and Agency Staff, and respond to all <br /> environmentally related questions outlined in agency letters requesting additional <br /> information ( RAI letters) . The above estimated cost is to cover one additional round of <br /> SJRWMD RAI responses and ACOE RAI responses . <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\0381 B-OSLO BOAT RAMP Phase II\Admim\Contracts\GK Environmental\OBR <br /> Amendment No 2 to Work Order No 1 4-9- 11 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.