My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-081
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:53:43 AM
Creation date
10/1/2015 6:08:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2014
Control Number
2014-081
Agenda Item Number
15.B.3
Entity Name
Geosnytec Consultants Inc
Subject
Work Order No. 9
Groundwater monitoring /reporting
Area
Former South Gifford Road Landfill
Supplemental fields
SmeadsoftID
13241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec D <br />consultants <br />Mr. Himanshu H. Mehta, P E <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 74111 Avenue SW <br />Vero Beach, Florida 32968 <br />6770 South Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />P14 321.269.5880 <br />FAX 321.269.5813 <br />www.geosyntec.com <br />23 May 2014 <br />Subject: Proposal to Provide One Year of Groundwater Monitoring/Reporting and <br />Related Consulting Services <br />Former South Gifford Road Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River <br />County (IRC) Solid Waste Disposal District (SWDD) to provide professional services for Florida <br />Department of Environmental Protection (FDEP)-required activities associated with continued <br />implementation of the groundwater monitoring for the chlorinated volatile organic compound <br />(CVOC) plume at the Former South Gifford Road Landfill located in Vero Beach, Indian River <br />County, Florida (Site). This fee proposal is based on correspondence with the FDEP and <br />discussions with IRC. As requested by IRC, this fee proposal includes budget to complete two <br />semi-annual monitoring and reporting events for the plume monitoring well network, as well as <br />related consulting services to prepare an annual pollution liabilities evaluation report for <br />identified IRC -owned environmental liabilities, represent IRC during interactions with regulatory <br />agencies, and dismantle the On -Site Interim Pump & Treat (IP&T) System. Geosyntec has <br />prepared this proposal (professional services as Exhibit 1) as Work Order No. 7 for the <br />Continuing Contract Agreement for Professional Services between IRC SWDD and Geosyntec, <br />dated 18 June 2013. The remainder of this letter provides an overview of the project <br />background, a description of the proposed scope of work a budget estimate, and a discussion of <br />the schedule for accomplishment of the work described herein. <br />PROJECT BACKGROUND <br />As part of the long-term monitoring activities for the identified CVOC plume associated with the <br />South Gifford Road Landfill, a network of monitoring wells will require sampling on an annual <br />or semi-annual basis to: (i) confirm that the CVOC plume is not migrating by monitoring the <br />lateral and vertical extent, (ii) evaluate the impact of source and dissolved plume bioremediation <br />XR14094\PR14027 20140523_REV <br />engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.