My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-081
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:53:43 AM
Creation date
10/1/2015 6:08:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2014
Control Number
2014-081
Agenda Item Number
15.B.3
Entity Name
Geosnytec Consultants Inc
Subject
Work Order No. 9
Groundwater monitoring /reporting
Area
Former South Gifford Road Landfill
Supplemental fields
SmeadsoftID
13241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />23 May 2014 <br />Page 3 <br />Task 1 — Project Management: Under this task, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice <br />review, project coordination, and project administration. The budget includes two hours per <br />month for the project manager over a 12 -month project duration and one hour per sampling/field <br />event has been included for the principal -in -charge. <br />Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and <br />attend up to two meetings, with IRC SWDD, FDEP, and/or IRC Board of County Commission, <br />as necessary. It is anticipated that one of these meetings may include preparation of a <br />presentation of the redevelopment assessment activities and results conducted to date under <br />authorization from the Treasure Coast Regional Planning Committee (TCRPC). Also, under this <br />task, four hours has been included for the project manager to provide ongoing support to IRC <br />SWDD related to interaction and negotiation with FDEP. <br />Task 3 — Annual Pollution Remediation Liabilities Evaluation: As requested by IRC SWDD, <br />under this task, Geosyntec will prepare the annual environmental liability evaluation. This <br />document is prepared annually in response to Governmental Accounting Standards Board <br />Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution <br />Remediation Obligations, which requires the inclusion and calculation of pollution remediation <br />obligations. The objective of GASB No. 49 is to enhance the usefulness and comparability of <br />pollution remediation obligation information reported by state and local governments. It has <br />been assumed that the report will include the evaluation of five sites, including South Gifford <br />Road Closed Landfill (4701 41St Street), Old Administration Building (1840 25th Street), Former <br />Cattle Dip Site (9255 93rd Street), North County Reverse Osmosis Plant (7751 58th Avenue), and <br />Shadowbrook Estates (7775 85th Street). <br />Task 4 — Semi -Annual Sampling Activities: Under this task, Geosyntec will perform all field <br />activities related to the plume groundwater monitoring. The field activities will include field <br />preparation, groundwater sampling, and water level measurements. Field preparation activities <br />will include scheduling and staffing subcontracting, coordination with the analytical laboratory, <br />field equipment preparation, and notifying FDEP and Vero Beach Municipal Airport of the field <br />schedule. <br />Geosyntec will perform the groundwater sampling activities associated with the CVOC plume <br />monitoring wells. Sampling activities will be completed with a combination of Passive <br />Diffusion Bag (PDB) samplers and traditional low -flow sampling techniques. PDBs are <br />anticipated to be purchased from EON Products, one of the few suppliers of this type of passive <br />sampling device. This effort is anticipated to be completed by two people within one day during <br />each of the semi-annual sampling events to save an additional mobilization (e.g. the PDBs to be <br />sampled during the winter 2014 sampling event will be deployed during the summer 2014 event <br />after sampling activities are completed). <br />XR 14096\PR 14027 20140523_REV <br />engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.