My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-041
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2015 10:16:32 AM
Creation date
10/1/2015 4:07:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2012
Control Number
2012-041
Agenda Item Number
15.B.3
Entity Name
Geosyntec Consultants
Subject
Work Order No. 3
Landfill Gas Flare Relocation Project
Area
Indian River County Class 1 Landfill
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Himanshu Mehta <br /> 13 February 2012 <br /> Page 2 <br /> 2 . In addition , an area with a footprint of approximately 76 acres , located immediately east and <br /> southeast of Segment 2 and , designated as Segment 3 Expansion , has been permitted by the <br /> Florida Department of Environmental Protection ( FDEP ) for construction and operation of a <br /> future Class I landfill capacity . Phase I of Cell 1 of the Segment 3 Expansion construction was <br /> completed in October 201 1 . This phase involved placement of fill material to bring the grades to <br /> the bottom of the liner system for the Cell 1 construction . Phase 2 of Cell I of the Segment 3 <br /> Expansion , which includes the installation of the liner and the leachate collection and removal <br /> system , is in its procurement stage . Because the existing LFG flare station is currently located <br /> within the footprint of Cell 1 , Phase 2 construction also includes its relocation to an area <br /> northeast of the Segment 3 Expansion , <br /> Segments 1 and 2 and the Infill Area are equipped with landfill gas collection and control system <br /> ( GCCS ) . The extracted gas is piped by vacuum to the flare station where combustible <br /> components ( mostly methane) are presently oxidized to carbon dioxide and water vapor prior to <br /> discharging the gas to the atmosphere . In the future , the gas will be conveyed via a dedicated <br /> pipeline from the flare station to the adjacent waste-to -ethanol facility, currently being <br /> constructed north of the landfill site , where it will be used as supplemental fuel to the process by <br /> lneos New Planet BioEnergy ( INPB ) under a contractual agreement with SWDD . <br /> INPB has asked SWDD to advance the relocation schedule of the LFG flare station in order to <br /> integrate the installation of the gas conveying system into the construction /operation schedule of <br /> the wasteAo - ethanol facility . Responding to this request, SWDD requested Republic Services , <br /> Inc . ( RSI ) , the current landfill operator, to submit a proposal for early execution of <br />the flare <br /> station relocation project ahead of Phase 2 construction of Cell 1 , in accordance with the terms of <br /> service agreement between RSI and SWDD . RSI selected Golder Associates (Golder) , its <br /> subcontractor for operation and maintenance (O & M ) of the GCCS , to undertake the LFG flare <br /> station relocation project in accordance with Geosyntec design . In addition , SWDD asked <br /> Geosyntec to submit a proposal to provide CQA and engineering support services required for <br /> early execution of the LFG flare station relocation project . This proposal describes the services <br /> to be provided in fulfillment of that request . <br /> PROPOSED SCOPE OF WORK <br /> This project includes professional engineering services that will be performed for the relocation <br /> of the LFG flare station and associated work . The scope of services includes revision to the <br /> scope of work of Phase 2 construction of Cell 1 to reflect the early completion of LFG flare <br /> station relocation and field CQA and engineering support services for the LFG flare station <br /> relocation project . For budgeting purposes , the scope of work will be performed in three phases <br /> as follows : <br /> XI . 12055 /.11 . 12014_J ► . 12014_Proposal for LFG flare CQA & Engineering Support <br /> rt 1 : Y1l117I 1 1 ' t WWI i , I I1111wlhw'% <br />
The URL can be used to link to this page
Your browser does not support the video tag.