My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-041
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2015 10:16:32 AM
Creation date
10/1/2015 4:07:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2012
Control Number
2012-041
Agenda Item Number
15.B.3
Entity Name
Geosyntec Consultants
Subject
Work Order No. 3
Landfill Gas Flare Relocation Project
Area
Indian River County Class 1 Landfill
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Himanshu Mehta <br /> 13 February 2012 <br /> Page 5 <br /> • All hours worked on the landfill gas flare relocation project will be billed at the rates <br /> indicated in the attached budget estimate with no premium charged for overtime . <br /> • The Contractor will directly retain the services of a licensed professional land surveyor <br /> for preparation of the as- built record drawings as described above . <br /> • Geosyntec will minimize courier fees by exchanging information between SWDD and <br /> Geosyntec via e - mail or facsimile and follow- up by regular mail . However, some courier <br /> shipments may be unavoidable . <br /> • Geosyntec will provide a nuclear moisture/density gauge for use by the CQA Senior <br /> Engineering Technician . It is assumed that a proper overnight storage area for the gauge <br /> will be provided . Other equipment that will be provided by Geosyntec will include ; field <br /> computer, digital camera, data collectors , hand held GPS , and other miscellaneous field <br /> equipment. Geosyntec has elected to provide this equipment at no cost to SWDD . <br /> • Costs for expenses ( including gas , tolls , field sampling supplies , truck rental and other <br /> project- specific purchases and expenses) will be invoiced at no additional increase or <br /> surcharge . <br /> • Geosyntec proposes to provide a rental /company vehicle for use by Geosyntec CQA <br /> personnel on site at a daily unit rate of $ 80 . Due to recent rapidly rising fuels costs , the <br /> daily unit rate for this vehicle does not include the costs of fuel and tolls which will <br /> be <br /> invoiced at cost . <br /> A budget estimate for the scope of work outlined in Phase 1 through 3 of this proposal is <br /> summarized in the following table , and a detailed budget estimate is provided as Attachment A . <br /> Phase I — General Consulting/Meeting Support/ Project Management $ 018 <br /> Phase 2 — Field CQA Services $ 15 , 093 <br /> Phase 3 — CM and Engineering Support Services $ 7 , 035 <br /> TOTAL $ 30 , 746 <br /> Geosyntec will not exceed the cost estimate without prior approval and written authorization <br /> from SWDD . <br /> X1 . 12055 /11 , 12014 .IL12014_1'roposal for I FG flare CQA d 11;ngineering Support <br />
The URL can be used to link to this page
Your browser does not support the video tag.