My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-127
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 12:16:47 PM
Creation date
10/1/2015 2:14:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/18/2010
Control Number
2010-127
Agenda Item Number
8.F.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements
Work Order No. 27
Area
Oslo Road between 43rd Avenue and 27th Avenue
Supplemental fields
SmeadsoftID
9690
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Michael Nixon <br /> 23 March 2010 <br /> Page 2 <br /> It is anticipated that IRC will provide input and/or example specifications for the <br /> excavation backfill since the area will be reconstructed as a roadway . Upon approval of <br /> the draft bidding package , Geosyntec will send the bidding packages to a minimum of <br /> three Pollutant Storage System Contractors (PSSCs) , coordinate and attend a pre -bid <br /> meeting and respond to any bidder questions . Upon receipt of PSSC bids , Geosyntec will <br /> evaluate the bids , recommend the lowest qualified subcontractor and prepare and submit <br /> a turn-key proposal to IRC which includes Geosyntec ' s costs for implementing the UST <br /> closure, remediation activities , contractor oversight, environmental monitoring and <br /> sampling in accordance with Chapter 62 -761 , FAC , and reporting activities . <br /> We have developed a task-based approach to group field activities and accomplish this work in <br /> an organized and cost-effective manner . The remainder of this letter provides a description of <br /> the proposed scope of work and a budget estimate to accomplish the work described herein <br /> (Attachment A) . <br /> PROPOSED SCOPE OF WORK <br /> Task 1 : Field Work Preparation <br /> Prior to initiating field activities , Geosyntec will update a Site - Specific Health & Safety Plan <br /> ( SSH& SP) , in accordance with the requirements of 29 CFR Part 1910 . Additionally , Geosyntec <br /> will procure the ground penetrating radar (GPR) subcontractor, drilling subcontractor, analytical <br /> laboratory, collect and organize the field sampling equipment, and coordinate the field work with <br /> IRC personnel . <br /> Task 2 : Field Activities <br /> Project field activities will consist of the following subtasks : <br /> • Immediately prior to the initiation of drilling activities , Geosyntec personnel will meet <br /> with a utility locate subcontractor to perform an underground utility locate to clear all <br /> proposed drilling locations prior to the performance of any subsurface ground penetrating <br /> work. <br /> XR10109lCCR10024. DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.