My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-303
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 1:14:49 PM
Creation date
10/1/2015 2:36:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/07/2010
Control Number
2010-303
Agenda Item Number
8.X.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements Phase II
Amendment No.1 to Work Order 27
Area
Oslo Road between 43rd Ave. and 27th Ave.
Supplemental fields
SmeadsoftID
9895
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ti. . <br /> PETROLEUM RESOURCES & DEVELOPMENT , INC . <br /> 2460 N Courtenay Pkwy , Suite 112 <br /> Merritt Island , FI . 32953 <br /> TEL: ( 321 ) 986-6026 FAX : ( 321 ) 986-6036 <br /> 10 -28 - 10 <br /> Jim Langenbach <br /> 6770 S Washington Ave , Suite 3 <br /> Titusville, F1 32780 <br /> Jim : <br /> Please find the completed quote that you requested . <br /> PR&D , Inc . is taking the approach of installing well points 5 ' on center around each of the <br /> excavations , leaving one end semi open for entry & exit . We will be stepping the dewatering <br /> points & header away from the planned excavation to incorporate sloping of the excavation for <br /> backfilling, compacting & density test . <br /> We will operate the dewatering system prior to excavation so we will excavate dry soil & <br /> backfill into a dry excavation . <br /> The treated water will be directed through an air stripper with either a holding tank or bag filters . <br /> The effluent will be pumped through a carbon vessel for polishing . <br /> All excavation activities shall be performed in accordance with OSHA Regulations, 29 CFR <br /> 1926 , Subpart P and the Florida Trench Safety Act, Florida Statutes Chapter 553 , Part VI . <br /> PR&D , Inc . will comply with the applicable trench safety standards . <br /> PR&D . Inc . is estimating 17 days to complete the project . <br /> If you have any questions re, please feel free to call me at ( 321 ) 288 -2767 . <br /> Sincerely : <br /> Kenneth P . Richard <br /> Vice President <br /> www.prdincorporated. com <br />
The URL can be used to link to this page
Your browser does not support the video tag.