Laserfiche WebLink
at + r7CUl1LC Ur rml% iCJ ' VUMCCKI.HIVU rAKRK) ffW100 , Zq '1 .4 41SI0 Ka , veru t3eaacn , t- lortaa <br /> Bid Item Extended <br /> # Item Description Unit I Unit Rate I Quantity Cost <br /> 1 General <br /> Provision of 40 Hr OSHA Training Certificates for Site Workers and Documentation of PSSC 10 0 • 0 <br /> 1 . 1 license LS $ <br /> $ 250 . 0 <br /> 1 . 2 Preparation and provision of Earthwork Work Plan and Project Schedule LS <br /> 1 .3 Mobilization to Site LS 3 2 500 . 0 <br /> 1 . 4 Demobilization LS — $ r 5 <br /> 1 . 5 Provision of required post-excavation documentation _ LS $ 2 0 0 ' 0 <br /> _ 2 Site Work — <br /> 2. 1 Installation of temporary 6 ft chain link security fence (as outlined on drawings) LS $ 1 , 900003 <br /> 2. 2 Installation of silt fence LS $ 5 0 0 0 <br /> Remove and dispose (includes T& D) of overhead canopy structure, pump islands , and footers <br /> 2. 3 (including electrical disconnects) LS s 1 2 , 0 0 0 . 0 <br /> Remove and dispose (includes T&D) of on-site signage and associated footers (including LS s 41 5 0 0 . 0 <br /> 2.4 electrical disconnects) <br /> VAC truck and/or equivalent services associated with cleaning of the three USTs prior to <br /> removal, including proper off-site disposal of rinseate and/or petroleum contact fluids and any <br /> 2. 5 sludge from three USTs LS $ 2 , 200a00 <br /> Remove and dispose (includes T&D) of three, 8 ,000 gallon USTs, piping system , andLS $ 1 5 , 000 . 00 <br /> 2. 6 asphall1concrete debris <br /> Over-excavation of UST area and former UST area to 10 ft bls with associated soil stockpiling <br /> (including dewatering/treatment and/or saturated zone excavation with aeration and follow-up <br /> excavation draining). DESCRIBE IN DETAIL IN A COVER LETTER THE SELECTED <br /> 2. 7 IMPLEMENTATION APPROACH _ LS s52 , 600 . 00 <br /> Off-site TRANSPORT of excavated soils (soil disposal in lRC Class I landfill - tipping fee covered <br /> 2. 8 internally by IRC) BCY s8 - 00 1800 s 1 4 4 0 0 . 0 <br /> Purchase, delivery and backfilling (in dry dewatered condition) with clean fill and associated 4 0 5 0 0 . 0 <br /> 2 .9 compaction in accordance with Section 02200 - Earthwork BCY s22 . 50 1800 $ <br /> 2. 10 Installation and removal of 2 temporary 12 ft pre-pack monitoring wells LS $ 500000 <br /> Final grading and site cleanup (includes removal of chain link fence and removal and disposal of 5 0 0 . 0 <br /> 2. 11 silt fence) LS $ <br /> Additional Excavation Beyond Defined Area (includes any additional costs for stockpiling , <br /> 2. 12 pavement/concrete removal and disposal and restoration) BCY $ 3 0 0 0 <br /> TOTAL x150 , 200 ' 0 <br /> Notes: PR & D Quote # 1837 - 10 <br /> 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications. <br /> 2. BCY - Bank cubic yards. <br /> 3. Any volume to tonnage based calculations/conversions shall be based upon an assumption of 1 .4 tons/cy <br /> 4. Unit rate items to be reimbursed in accordance with the actual units completed (e.g. if 1650 BCY are excavated 2, 310 tons], only 1 ,650 BCY shall <br /> be <br /> charged). Additional excavation volumes, transport, and disposal (items 2. 12) will not be reimbursed unless PRIOR WRITTEN APPROVAL is provided by <br /> Geosyntec. <br /> 5. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards. <br /> SUBCONTRACTOR: Petroleum Resources & Development , Inc . DATE:10 - 28 - 10 <br /> SIGNATURE: 14.A <br />