My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-303
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 1:14:49 PM
Creation date
10/1/2015 2:36:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/07/2010
Control Number
2010-303
Agenda Item Number
8.X.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements Phase II
Amendment No.1 to Work Order 27
Area
Oslo Road between 43rd Ave. and 27th Ave.
Supplemental fields
SmeadsoftID
9895
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 28 1, 0 05 : 43p Hcc Environment Svc 352 # 473 # 9841 p . l <br /> Groundwater Remediation Construction Services <br /> 340 S .W. Jasmine Avenue ( 352 ) 473- 9801 <br /> Keystone Heights , FL 32656 Fax (352) 473 -9841 <br /> October 28 , 2010 <br /> Geosyntec Consultants <br /> 6770 S . Washington Avenue, Suite 3 <br /> Titusville, FL 32780 <br /> Facsimile : 321 -269- 5813 <br /> ATTN : Jim Langenbach <br /> RE : Cumberland Farms #0955 <br /> 2614 Oslo road <br /> Vero Beach , FL <br /> HCC Bid #10-36 <br /> Dear Jim : <br /> HCC thanks you for the opportunity to bid this job on your enclosed bid sheet according to your <br /> plans and specifications described in the bid package. I would like to make the following <br /> clarifications : <br /> 1 . Estimated construction time will be approximately thirteen ( 13 ) working days and one <br /> ( 1 ) day each for mobe and demobe. <br /> 2 . Dewatering method : Due to the compaction requirements of a dry hole I do not think <br /> it will be feasible to dig the excavation wet and then try to dewater later. I am proposing a <br /> traditional well point system or a horizontal dewatering sock connected to a 6 " vacuum pump <br /> and treated with a portable air stripper before discharging into the adjacent pond . Although this <br /> method may be more costly it is the best way to insure a dry hole for compaction purposes . <br /> 3 . Clean backfill that meets the specification requirements will come from the Stewart <br /> Mine which passes MOT road specifications and we have a recent analytical of the soil to <br /> satisfy your requirements. <br /> 4 . Temporary pre-pack wells will be installed by us and supplied by others . <br /> We look forward to the successful completion of this project in the near future. If you have any <br /> questions or I can be of further assistance, please feel free to contact me at my office. <br /> Sincerely <br /> L <br /> EARL M HATCH, , President <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.