My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-064
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 11:16:49 AM
Creation date
10/1/2015 4:17:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/10/2012
Control Number
2012-064
Agenda Item Number
15.B.2
Entity Name
Geosyntec Consultants
SWDD
Subject
Work Order No.4 Phase 2 construction of Cell 1 Segment 3
Area
Indian River County Landfill Class 1
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11084
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Himanshu Mehta, P . E . <br /> 26 March 2012 <br /> Page 8 <br /> additional month for project certification and FDEP approval . Thus, Cell 1 of the Segment 3 <br /> Expansion should be ready to accept waste by 1 September 2012 . <br /> Geosyntec recognizes the importance of the schedule for SWDD and their need to obtain the <br /> required disposal capacity from the first cell of Segment 3 Expansion of the Class I landfill . <br /> Throughout the duration of the Project, Geosyntec will work diligently to meet those milestones <br /> and the schedule developed for the Project . <br /> BUDGET ESTIMATE <br /> The following assumptions were used by Geosyntec in developing the budget estimate presented <br /> below : <br /> • The total project duration will be 5 months with an anticipated start date on or 4 April <br /> 2012 . The construction schedule, based on the Contract Documents , is anticipated to be <br /> 3 months ( 12 weeks) . <br /> • QA/QC monitoring is budgeted for 12 hours per day, 6 days per week (72 hours per <br /> week) . <br /> • All hours worked on the project will be invoiced at the rates indicated in the detailed <br /> budget estimate . Geosyntec assumes that we will be compensated for any time over 72 <br /> hours per week should the contractor elects to exceed this schedule . No standby time will <br /> be applied to the CQA personnel for days not worked , provided at least 40 hours are <br /> invoiced each week for the field CQA person . If federal statutory holidays are worked <br /> (i . e . , Memorial Day , Independence Day, etc . ) the rates provided will be doubled for hours <br /> worked on these days . Should the minimum weekly chargeability goal of 40 hours for <br /> each CQA personnel not be achieved (as a result of bad weather or other unforeseen <br /> circumstances ) , Geosyntec will demobilize the CQA personnel in order to control the <br /> budget . <br /> ® All hours worked on the Phase 2 — Cell 1 construction project will be billed at the rates <br /> indicated in the attached budget estimate with no premium charged for overtime . <br /> • The contractor will directly retain the services of a licensed professional land surveyor <br /> for preparation of the as -built record drawings described above . These drawings will be <br /> provided to Geosyntec in a timely manner for submittal with the final CQA certification <br /> report . <br /> • Geosyntec will minimize courier fees by exchanging information between SWDD and <br /> Geosyntec via e -mail or facsimile and follow-up by regular mail . However, some <br /> NCP2012\XL 12090\JL 12034 <br /> engi ! ? r .rs I sfl(Il, Ositi I innoVarors <br />
The URL can be used to link to this page
Your browser does not support the video tag.