My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-064
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 11:16:49 AM
Creation date
10/1/2015 4:17:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/10/2012
Control Number
2012-064
Agenda Item Number
15.B.2
Entity Name
Geosyntec Consultants
SWDD
Subject
Work Order No.4 Phase 2 construction of Cell 1 Segment 3
Area
Indian River County Landfill Class 1
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11084
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P . E . <br /> 26 March 2012 <br /> Page 9 <br /> express shipments may be unavoidable . Although not included in this estimate , all <br /> shipping or other similar communication fees incurred will be invoiced at cost. <br /> • Geosyntec CQA personnel require space for office work and small equipment storage <br /> while on site . IRC will provide adequate field facilities with necessary utilities , and <br /> access to a phone , fax machine , and copier. Geosyntec will provide a mobile telephone <br /> to the CQA Site Manager and other technicians during the construction phase . <br /> • Geosyntec will provide a nuclear moisture/density gauge for use by the CQA personnel . <br /> It is assumed that a proper overnight storage area for the gauge will be provided . Other <br /> equipment that will be provided by Geosyntec will include ; field computer, digital <br /> camera, data collectors , hand held GPS , and other miscellaneous field equipment . <br /> Geosyntec has elected to provide this equipment at no cost to SWDD . <br /> • Geosyntec will prepare a site specific Health and Safety Plan specifically for use by <br /> Geosyntec CQA personnel employees working onsite . <br /> • Costs for expenses (including gas , tolls, field sampling supplies, truck rental and other <br /> project- specific purchases and expenses) will be invoiced at no additional increase or <br /> surcharge . <br /> • Geosyntec proposes to provide a rental/company vehicle for use by Geosyntec CQA <br /> personnel on site at a daily unit rate of $ 80 . Due to recent rapidly rising fuels costs, the <br /> daily unit rate for this vehicle does not include the costs of fuel and tolls which will be <br /> invoiced at cost . <br /> A budget estimate for the scope of work outlined in Phases 1 through 6 of this proposal is <br /> summarized below, with a detailed budget estimate provided as Attachment A . <br /> Phase 1 : General Consulting/Meeting Support/Project Management $295582 <br /> Phase 2 : Preparation of Issued for Construction Documents $ 93949 <br /> Phase 3 : QA/QC Services $ 1183706 <br /> Phase 4 : Construction Management $ 503499 <br /> Phase 5 : Resident Engineering and Certification Services $ 51 , 756 <br /> Phase 6 : Miscellaneous Engineering Support Services $29 , 287 <br /> TOTAL $289 ,779 <br /> Geosyntec will not exceed the cost estimate without prior approval and written authorization <br /> from SWDD . <br /> NCP20120M 12090UL 12034 <br /> engineet's i Scientisif, I hirim 1tor5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.