Laserfiche WebLink
Mr . Himanshu Mehta, P . E . <br /> 26 March 2012 <br /> Page 4 <br /> Phase 2 : Preparation of Issued for Construction Documents <br /> The procurement documents included both the LFG flare relocation and Cell 1 liner and leachate <br /> control systems construction projects . However, because the LFG flare relocation project had <br /> then been awarded to Golder through RSI , an addendum was issued during the bidding process <br /> to remove those items from the bid . Geosyntec will update all the construction documents to <br /> remove the components related to the LFG flare station relocation project and complete Issued <br /> for Construction Documents for the selected contractor . The documents affected include <br /> Construction Drawings , Technical Specifications , and CQA Plan . These documents will also be <br /> revised to include all addenda issued during the bidding process . A copy of the Issued for <br /> Construction Documents will be submitted to FDEP Central District and a meeting will be <br /> scheduled to address any concerns prior to contractor mobilization . The meeting with FDEP is <br /> budgeted under Phase 1 . <br /> Phase 3 : QA/QC Services <br /> Geosyntec will provide Quality Assurance and Quality Control (QA/QC) services throughout the <br /> construction phase to ensure that the landfill cell is constructed in accordance with the design <br /> approved by FDEP to the highest construction quality standards . QA/QC services consist of <br /> three components , including : <br /> • field monitoring QA/QC services ; <br /> • geotechnical CQA laboratory services ; and <br /> • geosynthetic CQA laboratory services . <br /> Field QA/QC Services <br /> Geosyntec will provide QA/QC services during construction of the Project . QA/QC monitoring , <br /> testing methods, test frequencies, and the reporting requirements will be performed in <br /> accordance with the CQA Plan, Technical Specifications, and applicable portions of Chapter 62 - <br /> 701 , F .A . C . The work will be executed by an experienced project team consisting of office <br /> managerial staff and on - site CQA representatives . Geosyntec will provide on-site monitoring <br /> services for the activities associated with construction of the project . The QA/QC services will <br /> be provided by a CQA Site Manager and Engineering Technicians, as needed . The CQA Site <br /> Manager will be responsible for QA/QC activities throughout the Project including monitoring <br /> construction, coordinating soils , and geosynthetics testing , and maintaining documentation of <br /> CQA activities at the site . <br /> NCP2012\xL 12090\JL 12034 <br /> engineers, I st 'if.' ndsis j 11711owators <br />