My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-177
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 9:58:33 AM
Creation date
10/1/2015 2:46:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
08/16/2011
Control Number
2011-177
Agenda Item Number
12.J.3
Entity Name
Geosyntec Consultants Inc.
Subject
Amendment Number 1 to Work Order No. 26
Ground water assessment and monitoring proposal
Area
North County Water Plant
Supplemental fields
SmeadsoftID
10096
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Terry Southard Geosyntec "' <br /> 29 July 2011 consultants <br /> Page 3 <br /> submit one hard copy and one electronic copy of each final groundwater sampling report to the <br /> FDEP and one hard copy and a PDF on CD will be provided to you. <br /> ASSUMPTIONS <br /> In addition to the above, the following assumptions were made in developing this scope and cost <br /> estimate : <br /> • IRC and/or IRC ' s sampling subcontractor will notify FDEP of the date of each of the <br /> proposed semi - annual sampling events at least 3 days in advance of sampling. <br /> • In advance of purging/sampling of any wells during a sampling event, IRC will have their <br /> subcontractor conduct the required depth to groundwater measurements from the <br /> monitoring wells required by the FDEP - approved NAM plan. Water-level measurements <br /> will be used by Geosyntec in conjunction with the existing surveyed well elevations for <br /> continued evaluation of groundwater flow directions . <br /> • Issues identified by Geosyntec associated with the data package provided by IRC of the <br /> field activities and the laboratory results of the groundwater sampling effort will be <br /> addressed by IRC at no cost or effort to Geosyntec . <br /> • Budget has not been included for any additional delineation sampling or monitoring well <br /> installations . <br /> ESTIMATED BUDGET <br /> The proposed scope of work will be completed on a time and materials basis . The cost for <br /> performing the preparation of a response to comments letter report and two semi - annual <br /> groundwater sampling reports is $7, 179 . Any requested tasks which are outside the defined <br /> scope of work will be completed in accordance with the hourly rate schedule negotiated with <br /> Indian River County ( SWDD Contract) . A summary of estimated project costs is included in <br /> Attachment A . <br /> CLOSURE <br /> Geosyntec appreciates the opportunity to submit this proposal to provide environmental <br /> consulting services to the IRC Utilities Department . Upon receipt of the Purchase Order from <br /> XR I 1179/CCR 11065 . DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.