My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-032
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 12:30:17 PM
Creation date
10/1/2015 1:59:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2010
Control Number
2010-032
Agenda Item Number
8.M.
Entity Name
Geosyntec Consultants Site Assessment Addendum
Subject
Former Cattle Dip Site
Work Order No. 24
Supplemental fields
SmeadsoftID
9560
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Nixon Geosyntec <br /> 30 November 2009 consultants <br /> Page 5 <br /> Task 4 — Site Assessment Addendum Report <br /> Geosyntec will prepare a brief SARA after the installation and sampling of the monitoring wells . <br /> It is anticipated that the SARA will include the following : <br /> • brief description of field activities ; <br /> • results of the well survey; <br /> • general lithologic characterization; <br /> • summary tables of the groundwater sampling results and groundwater elevations ; <br /> • maps that show the locations of the monitoring well network, provide a summary of the <br /> groundwater sampling results and provide a summary of the groundwater elevations ; and <br /> • recommendations . <br /> A draft copy of the report will be provided to IRC for review . Any comments from IRC will be <br /> incorporated into the SARA and a final version of the report will be prepared . One hard copy <br /> and one electronic copy of the final report will be submitted to the FDEP for review and two <br /> hard copies of the fmal report will be submitted to IRC . The final reports will be signed/sealed <br /> by the Florida Licensed Professional Engineer in responsible charge of the project. <br /> A breakdown of estimated project costs is included as Attachment B . <br /> Task 5 — Semi-Annual Monitoring Well Sampling <br /> Task 5 is included to cover one semi-annual sampling event for the monitoring well network, <br /> which will likely be required by the FDEP, assuming a Natural Attenuation Monitoring program <br /> is approved for the site by the FDEP . This event would occur after completion and submittal of <br /> the SARA to the FDEP and approximately six months after the monitoring well network was <br /> sampled previously. This event includes the sampling of the monitoring well network (three <br /> existing wells and six newly installed wells) . It also includes collecting a set of water level <br /> measurements from the monitoring well network. The monitoring wells will be sampled and <br /> purged according to the FDEP SOPS and the groundwater samples collected will be laboratory <br /> analyzed for arsenic by EPA Method 6010 . <br /> Task 6 — Semi=Annual Sampling Letter Report <br /> Geosyntec will prepare a Semi-Annual Sampling Letter Report after completion of the semi- <br /> annual monitoring well sampling event . It is anticipated that the Letter Report will include : <br /> 0 <br /> XR09305/CCR09108 . DOC <br /> fn1i rneers sC1enhslt - 11 ( 11 ,; <br />
The URL can be used to link to this page
Your browser does not support the video tag.