Laserfiche WebLink
Mr. Mike Nixon Geosyntec° <br />30 November 2009 consultants <br />Page 6 <br />• brief description of field activities; <br />• summary tables of the groundwater sampling results and groundwater elevations; <br />• maps that provide a summary of the groundwater sampling results and provide a <br />summary of the groundwater elevations; and <br />• recommendations. <br />ASSUMPTIONS <br />The following assumptions were made in developing this fee proposal: <br />• All site work can be performed in Level D personal protective equipment. <br />• Geosyntec will be able to work unimpeded Monday through Friday from 7 am to 7 pm. <br />• Geosyntec has assumed that liquids generated during the monitoring well purging and <br />sampling will be discharged directly onto the ground adjacent to the monitoring well (for <br />percolation or evaporation). <br />SCHEDULE <br />Geosyntec anticipates that upon approval from IRC, site assessment addendum activities will be <br />initiated within four weeks. It is anticipated that the monitoring well sampling results will be <br />available approximately two weeks after completion of the sampling. The draft SARA will be <br />provided to IRC within four weeks of completion of field activities. <br />ESTIMATED BUDGET <br />The fee proposal is provided as Attachment B. The total estimated budget to complete the work <br />described in the fee proposal is $31,432 (which includes the 100% contingency on Task 2). <br />CLOSURE <br />Geosyntec appreciates the opportunity to submit to IRC the attached fee proposal (Attachment <br />B) for services at the site. If this proposal is acceptable to you, please indicate your agreement <br />by signing the Work Authorization, which references this proposal. Please return one signed <br />Work Authorization to Dr. Daprato's attention. <br />XR09305/CCR09108. DOC <br />O igirw('rs I sclenllsts I tJ)JJ )`r:1t )1" <br />