Laserfiche WebLink
Mr . Himanshu Mehta, P . E . <br /> 9 Apri1201 1 <br /> Page 8 <br /> Phase 4 — Miscellaneous Engineering and Technical Support Services <br /> Under this phase , Geosyntec will provide engineering assistance to SWDD in connection with <br /> the operation and environmental compliance of the landfill site . This will include the following <br /> two tasks : <br /> • Task 4 . 1 — Review and comment on SWDD ' s updates of the Storm Water Pollution <br /> Prevention Plan (SWPPP) and the Spill Prevention , Control and Countermeasures <br /> ( SPCC ) Plan for the landfill site ; and <br /> • Task 4 . 2 — Other landfill operational and technical support services . <br /> Each of these tasks is described below. <br /> Task 4. 1 : Updating SWDD ' s SMTP and SPCC Plan for the Landfill Site <br /> Geosyntec will review and comment on the latest SWDD ' s updates of the SWPPP and the SPCC <br /> of the landfill site for completeness and compliance with EPA guidelines . <br /> Task 4.2 : Other Landfill Operation and Technical Support Services <br /> Geosyntec understands that SWDD has essentially privatized the complete solid waste <br /> management operations services to Republic under the current contract . Therefore, Republic <br /> will be responsible for operations and maintenance of not only the Class I Landfill (with respect <br /> to solid waste disposal) but also for other components/systems at the site, including waste tire <br /> site area, household hazardous waste facility, recycling storage and loading area, etc . Therefore, <br /> the current landfill Operation Plan will have to be revised and updated to reflect changes in <br /> responsibilities and address the additional services required to maintain compliance with the <br /> FDEP permits . In addition, as part of the Notice of Intent to Issue the permit for the Class I <br /> Landfill , the FDEP has requested SWDD to submit for review and approval a revised Operation <br /> Plan addressing how C &D debris will be processed prior to being commingled for disposal in the <br /> Class I Landfill in order to meet the 75 % recycling goal passed by the Florida legislators in 2010 . <br /> This revised Operation Plan is to be submitted by May 1 , 2011 . <br /> Geosyntec also anticipates providing other technical support services to SWDD, Republic and <br /> NPE Ineos BioEnergy during the IRCL operations in 2011 . Geosyntec will respond to requests <br /> for information , clarifications , plan drawings and details , and other requests from Republic and <br /> NPE Ineos BioEnergy through SWDD . <br /> J1, 10086-Final <br />