Mr. Himanshu Mehta, P . E . <br /> 19 Apri1201 l <br /> Page 6 <br /> Phase 3 — Contractor Procurement Services <br /> Under this phase, Geosyntec will prepare construction documents for procuring a construction <br /> contractor for Phase 2 construction . This will include preparation of the request for bid (RFB ) <br /> documents ; attending the pre -bid meeting ; responding to bidders ' questions and preparing <br /> required updates to the bidding document throughout the bids preparation process ; evaluating <br /> bids ; and preparing a recommendation to SWDD of the prefer bid for Phase 2 construction . Our <br /> budget is based on the assumption that the entire RFB package including the construction <br /> drawings, specifications document, responses to questions and project update will be uploaded <br /> by the County ' s Purchasing Division onto Demandstar website where it will be available for <br /> downloading by candidate contractors wishing to respond to the RFB . For budgeting purposes , <br /> this phase has been broken down into three tasks, as described below . <br /> Task 3. 1 : Preparation of Construction Documents <br /> Geosyntec will prepare the construction documents (drawings , technical specifications, material <br /> quantities, and CQA Plan) required to procure a contractor for Phase 2 construction of Cell 1 of <br /> Segment 3 Expansion . Note that this phase of construction includes : ( i ) demolition of the four <br /> manholes east of Segment 2 ; ( ii) construction of a new leachate conveyance system to convey <br /> leachate from Segment 2 to a manhole north of the existing Class I landfill ; ( iii ) demolition of <br /> the stormwater conveyance structures north and south of Segment 2 ; ( iv) re -routing of the <br /> stormwater conveyance to the sedimentation pond ; (v) tie- in of the new liner system to existing <br /> Segment 2 liner system ; and (vi) design of the foundation and pad system for the flare system <br /> relocation . <br /> Details of the demolition of the manholes and stormwater structures , construction of the new <br /> leachate and stormwater conveyance systems as well as tie - in of the Cell 1 liner system to <br /> Segment 2 liner system will require additional analyses and close coordination with SWDD and <br /> its new landfill operator (Republic Services) . These components of the construction project all <br /> occur on the northern and eastern slopes of Segment 2 (next to the access road to the existing <br /> Class I Landfill ) and , therefore , will require close coordination between the construction <br /> contractor and the landfill operator to avoid interruptions to construction activities and/or normal <br /> landfill operations . In addition, all these activities generate waste materials that will have to be <br /> removed from the construction area and properly disposed of with cooperation of the landfill <br /> operator. SWDD may also be involved in the event of having to re-route the landfill traffic to <br /> avoid interference with the construction work . <br /> Another critical component of this project is the relocation of the existing gas flare to an area <br /> north of Segment 3 Expansion footprint, near the yard waste processing area . Relocation of the <br /> J1, 10086—Final <br /> c, llk i tt 4 ' #'s I wc11' ic nti us i illnovalors <br />