Mr . Himanshu Mehta, P . E . <br /> 14 June 2010 <br /> Page 3 <br /> of approximately 10 acres and adjacent to the eastern slope of Segment 2 . The implementation <br /> of this Project will be carried out in two phases , as follows : <br /> • Phase 1 : Site preparation activities consisting primarily of the earthwork for construction of <br /> the subgrade for Cell 1 ; the fill material will be obtained from off- site borrow sources with <br /> the actual placement and compaction to be performed either by SWDD staff and equipment <br /> or by a contractor through the procurement process . It is understood that SWDD staff will <br /> handle the procurement process . This phase also includes the abandonment and installation <br /> of groundwater monitoring wells in accordance with the MPIS of the 5 -year renewal permit <br /> application . <br /> • Phase 2 : Construction of the Cell l liner and leachate control systems , and improvements to <br /> the stormwater management system and perimeter access roads , to be performed by a <br /> contractor selected through the procurement process . <br /> This proposal addresses the engineering and construction support services required to complete <br /> Phase 1 of the Project, including preparation of construction documents , construction <br /> management ( CM ) and construction quality assurance (CQA ) services during the placement and <br /> compaction of the fill material for the subgrade . <br /> PROPOSED SCOPE OF WORK <br /> This project includes professional engineering and construction support services that will be <br /> performed for the site preparation phase of the project . The scope of work is based on the <br /> requirements of Chapter 62 - 701 , Florida Administrative Code ( FAC) and Geosyntec ' s <br /> understanding of the project based on information provided by the SWDD . <br /> Geosyntec will provide all engineering services necessary to complete the site preparation of the <br /> site to facilitate construction of Cell 1 of the Segment 3 Expansion . The scope of services , <br /> therefore , includes construction - phase services , such as , providing SWDD with the relevant <br /> construction drawings and technical specifications , CM , and CQA monitoring, testing , and <br /> documentation services . The proposed budget and schedule are based on the understanding that <br /> SWDD staff will undertake the initial site preparation activities by removing and disposing muck <br /> and other foreign debris from the footprint of Cell 1 . SWDD staff will also demolish and <br /> partially relocate the north - south surface water drainage ditch and perimeter road between <br /> Segment 2 and Cell 2 of Segment 3 Expansion . However , placement, compaction , and grading <br /> of off- site borrow soils for subgrade and the re - location of the surface water drainage ditch and <br /> perimeter access road could be undertaken by either SWDD staff or a contractor . Regardless , the <br /> scope of services to be performed by Geosyntec to ensure that the fill material is placed and <br /> compacted in accordance with the project specifications and regulatory requirements will be the <br /> NCP2010/XL 101 12/J 1. 10086A . doc <br /> ( Ylninvers Scientists innovators <br />