Mr. HilnanshU Mehta, P . E . <br /> 14 June 2010 <br /> Page 6 <br /> testing, and documentation services during construction . Geosyntec understands that all quality <br /> control (QC) testing associated with the earthwork will be provided by an independent <br /> geotechnical testing firm through the contractor or soil supplier . <br /> Task 3 . 1 : CQA Surveying <br /> As requested by SWDD , Geosyntec will subcontract the services of a Registered Land Surveyor <br /> to provide the surveying required and prepare the as - built record drawing of the Cell 1 subgrade <br /> construction . Geosyntec sent request for bid (RFP) for surveying services to three surveying <br /> firms in the area, and based on the price and experience , has selected Peavey & Associates <br /> ( Peavey) to provide surveying services . Peavey will assist SWDD staff in the subgrade <br /> preparation work and provide data to check material quantities for measurement and payment <br /> purpose . Peavey will also survey the locations of the new groundwater monitoring wells and <br /> prepare the required drawing for submittal to FDEP as indicated in Phase 4 of this proposal . A <br /> copy of Peavey ' s proposal is enclosed as Attachment A . <br /> Task 3.2 : CM and Engineering Support Services <br /> Geosyntec will provide CM and engineering support services throughout the duration of the site <br /> preparation work . Construction management activities will include conducting pre -construction <br /> and monthly construction progress meetings with the entity selected by the SWDD to prepare the <br /> site for the construction . Geosyntec will evaluate Contractor payment requests, verify quantities <br /> and conformance with the plans and specifications , and provide contract administration . <br /> As part of this phase , Geosyntec will review laboratory conformance and field performance tests <br /> results (performed through the Contractor) and as - built record drawings for inclusion in the Cell <br /> 1 construction certification report . Geosyntec will therefore review all test results and drawings <br /> to ensure compliance with the project specifications and FDEP - issued permit for the 1RCL <br /> facility . <br /> Phase 4e Installation and Abandonment of Monitoring Wells <br /> Construction of Cell I will require abandonment of three groundwater monitoring well clusters <br /> and two landfill gas ( LFG) probes , and the installation of five new monitoring well clusters and <br /> three LFG probes . In addition , an intermediate monitoring well , MW - 131 , will be installed next <br /> to MW - 13S to make it well cluster based on discussions with FDEP . Table l presents the <br /> schedule of wells and gas probes to be abandoned and installed . Geosyntec sent request for bid <br /> ( RFB ) for drilling services to three drilling firms in the area and , based price and experience has <br /> selected Environmental Drilling Services , Inc . ( EDS ) to serve as a drilling subcontractor to <br /> perform these services . A copy of EDS ' proposal is included as Attachment B . <br /> NC I'2010/X L 101 12/J L 10086A . doc <br /> cngineurs scientists i InnovatMs <br />