My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-165
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 4:21:39 PM
Creation date
10/1/2015 2:20:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/06/2010
Control Number
2010-165
Agenda Item Number
15.B.3.
Entity Name
Geosyntec
Subject
Landfill expansion Phase I cell 1 of Segment 3
Work Order No. 28
Supplemental fields
SmeadsoftID
9728
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. HlmanSlltâ–º Mehta, P . E . <br /> 14 June 2010 <br /> Page 5 <br /> borrow soils and for SWDD or contractor to prepare the subgrade for Cell I of Segment 3 <br /> Expansion . Geosyntec understands that SWDD might include in the bid package an option for <br /> the selected soil supplier to also provide material and prepare the subgrade for Cell 2 . Therefore , <br /> Geosyntec will include relevant information on Cell 2 subgrade in the construction documents . <br /> It is anticipated that the following drawings will be prepared : <br /> 1 . Cover Sheet ; <br /> 2 . Existing Site Conditions ; <br /> 3 . Landfill Cell Layout Plan (will also show monitoring wells to be abandoned and <br /> new wells to be installed ) ; <br /> 4 . Subgrade Grading Plan ; <br /> 5 . Construction Control Points Data; <br /> 6 . Perimeter Access Road Plan and Profile ; <br /> 7 . Vertical Expansion Access Road Plan and Profile ; <br /> 8 . Cross Sections and Details ; <br /> 9 . Surface Water Drainage System Details ; and <br /> 10 . Erosion and Sediment Control Details . <br /> The construction drawings will be prepared utilizing the Segment 3 Expansion Permit Drawings <br /> prepared by Geosyntec . Construction control points will be shown for the subgrade , drainage <br /> ditches , and road along the tops of berms , toes of slopes , and other locations sufficient for the <br /> cell construction . <br /> Technical Specifications and the CQA Plan will be compiled as part of the Construction <br /> Documents . The specifications will be prepared using the industry - standard Construction <br /> Specification Institute ( CSI) format. Geosyntec will also prepare a bid sheet with estimate of <br /> material quantities for the supplier/contractor procurement . <br /> Geosyntec will provide SWDD with two completed sets of the Construction Documents for <br /> procurement purposes . It is understood that SWDD and the Purchasing Department will manage <br /> the procurement process , including printing and distribution of the Contract Documents to <br /> qualified suppliers and contractors ; preparing responses to bidders ' questions during the bid <br /> process ; bid review and evaluation ; and contractor selection . <br /> Phase 3 - Construction-Phase Services <br /> Geosyntec will provide construction management ( CM) engineering support services associated <br /> with construction of the Cell 1 subgrade , including the following tasks : ( i ) CQA Surveying ; and <br /> ( ii ) CM and Engineering Services . Note that this scope does not include CQA monitoring , <br /> NCP2010/XL 101 12/JL 10086A . doc <br /> rngillmr: I sciendSLS I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.