Laserfiche WebLink
to show ENGINEER the services , materials , and CONTRACTOR ' s review and approval of that <br /> equipment CONTRACTOR proposes to provide and submittal . <br /> to enable ENGINEER to review the information for the <br /> limited purposes required by paragraph 6 . 17 . E . 3 . At the time of each submittal , COW <br /> TRACTOR shall give ENGINEER specific <br /> B . CONTRACTOR shall also submit Samples to written notice of such variations , if any, that the <br /> ENGINEER for review and approval in accordance Shop Drawing or Sample submitted may have <br /> with the acceptable schedule of Shop Drawings and from the requirements of the Contract <br /> Sample submittals . Each Sample will be identified Documents , such notice to be in a written <br />com- <br /> clearly as to material , Supplier, pertinent data such as munication separate from the submittal ; and , in <br /> catalog numbers , and the use for which intended and addition , shall cause a specific notation <br />to be <br /> otherwise as ENGINEER may require to enable ENGI . made on each Shop Drawing and Sample sub. <br /> NEER to review the submittal for the limited purposes mitted to ENGINEER for review and approval of <br /> required by paragraph 6 . 17 . E . The numbers of each each such variation . <br /> Sample to be submitted will be as specified in the <br /> Specifications . E . ENGINEER's Review <br /> C . Where a Shop Drawing or Sample is required 1 . ENGINEER will timely review and <br /> by the Contract Documents or the schedule of Shop approve Shop Drawings and Samples in <br /> Drawings and Sample submittals acceptable to ENGI - accordance with the schedule of Shop <br /> NEER as required by paragraph 2 . 07 , any related Drawings and Sample submittals acceptable to <br /> Work performed prior to ENGINEER's review and ENGINEER . ENGINEER ' s review and <br /> approval of the pertinent submittal will be at the sole approval will be only to determine if <br /> the items <br /> expense and responsibility of CONTRACTOR , covered by the submittals will , after installation <br /> or incorporation in the Work , conform to the <br /> D . Submittal Procedures information given in the Contract Documents <br /> and be compatible with the design concept of <br /> 1 . Before submitting each Shop the completed Project as a functioning whole as <br /> Drawing or Sample , CONTRACTOR shall have indicated by the Contract Documents, <br /> determined and verified : <br /> 2 . ENGINEER ' s review and approval <br /> a , all field measurements , quantities, will not extend to means, methods , techniques , <br /> dimensions, specified performance criteria , sequences , or procedures of construction <br /> installation requirements , materials , catalog (except where a particular means , method , <br /> numbers , and similar information with technique , sequence, or procedure of con- <br /> respect thereto ; struction is specifically and expressly called for <br /> by the Contract Documents) or to safety <br /> b , all materials with respect to intended precautions or programs incident thereto . The <br /> use , fabrication , shipping , handling , storage , review and approval of a separate item as such <br /> assembly, and installation pertaining to the will not indicate approval of the assembly <br />in <br /> performance of the Work ; which the item functions , <br /> c , all information relative to means , 3 . ENGINEER's review and approval of <br /> methods , techniques, sequences , and Shop Drawings or Samples shall not relieve <br /> procedures of construction and safety CONTRACTOR from responsibility for any <br /> precautions and programs incident thereto ; variation from the requirements of the Contract <br /> and Documents unless CONTRACTOR has in <br /> writing called ENGINEER's attention to each <br /> d . CONTRACTOR shall also have such variation at the time of each submittal as <br /> reviewed and coordinated each Shop required by paragraph 6 . 17 . D . 3 and ENGI - <br /> Drawing or Sample with other Shop NEER has given written approval of each such <br /> Drawings and Samples and with the variation by specific written notation thereof <br /> requirements of the Work and the Contract incorporated in or accompanying the Shop <br /> Documents . Drawing or Sample approval ; nor will any <br /> approval by ENGINEER relieve COW <br /> 2 . Each submittal shall bear a stamp or TRACTOR from responsibility for complying <br /> specific written indication that CONTRACTOR with the requirements of paragraph 6 . 17 . D . 1 , <br /> has satisfied CONTRACTOR's obligations <br /> under the Contract Documents with respect to <br /> 00700 - General Conditions REV 5-10-13. doc <br /> 00700 - 24 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00700 - General Conditions REV <br /> 5-10- <br /> 13 doc <br />