6 . 12 Record Documents or ENGINEER's Consultant, or anyone employed by <br /> any of them , or anyone for whose acts any of them <br /> A. CONTRACTOR shall maintain in a safe place may be liable, and not attributable, directly or <br /> at the Site one record copy of all Drawings, Specifica- indirectly, in whole or in part, to the fault or <br />negligence <br /> tions, Addenda, Written Amendments , Change of CONTRACTOR or any Subcontractor, Supplier, or <br /> Orders, Work Change Directives , Field Orders, and other individual or entity directly or indirectly employed <br /> written interpretations and clarifications in good order by any of them ) . CONTRACTOR's duties and <br /> and annotated to show changes made during responsibilities for safety and for protection of the <br /> construction . These record documents together with Work shall continue until such time as all the Work is <br /> all approved Samples and a counterpart of all completed and ENGINEER has issued a notice to <br /> approved Shop Drawings will be available to ENGk OWNER and CONTRACTOR in accordance with <br /> NEER for reference. Upon completion of the Work, paragraph 14 . 07. 13 that the Work is acceptable <br /> these record documents, Samples, and Shop (except as otherwise expressly provided in connection <br /> Drawings will be delivered to ENGINEER for OWNER. with Final Completion ) , <br /> 6 . 13 Safety and Protection 6 . 14 Safety Representative <br /> A. CONTRACTOR shall be solely responsible A. CONTRACTOR shall designate a qualified <br /> for initiating , maintaining and supervising all safety and experienced safety representative at the Site <br /> precautions and programs in connection with the whose duties and responsibilities shall be the <br /> Work. CONTRACTOR shall take all necessary prevention of accidents and the maintaining and <br /> precautions for the safety of, and shall provide the supervising of safety precautions and programs, <br /> necessary protection to prevent damage , injury or loss <br /> to: 6 . 15 Hazard Communication Programs <br /> 1 . all persons on the Site or who may A. CONTRACTOR shall be responsible for <br /> be affected by the Work; coordinating any exchange of material safety data <br /> sheets or other hazard communication information <br /> 2 . all the Work and materials and equip- required to be made available to or exchanged be- <br /> ment to be incorporated therein , whether in tween or among employers at the Site in accordance <br /> storage on or off the Site; and with Laws or Regulations . <br /> 3 , other property at the Site or adjacent 6 . 16 Emergencies <br /> thereto, including trees , shrubs, lawns, walks , <br /> pavements , roadways, structures, utilities, and A. In emergencies affecting the safety or protec- <br /> Underground Facilities not designated for tion of persons or the Work or property at the Site or <br /> removal , relocation , or replacement in the adjacent thereto, CONTRACTOR is obligated to act to <br /> course of construction . prevent threatened damage , injury, or loss. <br /> CONTRACTOR shall give ENGINEER prompt written <br /> B . CONTRACTOR shall comply with all applica- notice if CONTRACTOR believes that any significant <br /> ble Laws and Regulations relating to the safety of changes in the Wont or variations from the Contract <br /> persons or property, or to the protection of persons or Documents have been caused thereby or are required <br /> property from damage, injury, or loss; and shall erect as a result thereof. If ENGINEER determines that a <br /> and maintain all necessary safeguards for such safety change in the Contract Documents is required be- <br /> and protection . CONTRACTOR shall notify owners of cause of the action taken by CONTRACTOR in <br /> adjacent property and of Underground Facilities and response to such an emergency, a Work Change <br /> other utility owners when prosecution of the Work may Directive or Change Order will be issued . <br /> affect them , and shall cooperate with them in the <br /> protection , removal , relocation , and replacement of 6 . 17 Shop Drawings and Samples <br /> their property. All damage , injury, or loss to any <br /> property referred to in paragraph 6. 13 .A. 2 or 6 . 13 .A. 3 A. CONTRACTOR shall submit Shop Drawings <br /> caused , directly or indirectly, in whole or in part, by to ENGINEER for review and approval in accordance <br /> CONTRACTOR , any Subcontractor, Supplier, or any with the acceptable schedule of Shop Drawings and <br /> other individual or entity directly or indirectly employed Sample submittals. All submittals will be identified as <br /> by any of them to perform any of the Work, or anyone ENGINEER may require and in the number of copies <br /> for whose acts any of them may be liable, shall be specified in the General Requirements. The <br />data <br /> remedied by CONTRACTOR (except damage or loss shown on the Shop Drawings will be complete with <br /> attributable to the fault of Drawings or Specifications respect to quantities, dimensions , specified perfor- <br /> or to the acts or omissions of OWNER or ENGINEER mance and design criteria, materials , and similar data <br /> 00700 - General Conditions REV 570-13 <br /> 00700 - 23 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior BallfieldWdmin\bid documents\MasterContract\Contract Documents\00700 - General Conditions REV 510- <br /> 13.doc <br />