My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 11 -06-2013 <br /> SECTION — 2 - EROSION CONTROL AND TREATMENT OF DEWATERING WATER <br /> AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off-site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project' s construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , "Best Management <br /> Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment <br /> Control Inspector' s Manual , and other references as may be required by regulatory <br /> permits . ( http : //www . dep . state .fl . us ./water/nonpollnt/docs/erosion/erosion - <br /> inspectors-manual . pdfl <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively, the OWNER may halt the CONTRACTOR' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering" of the Florida Erosion and Sediment Control Inspector' s Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay <br /> for all other required permits , licenses , sampling , and tests . Permits the <br /> CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long-term and/or short-term dewatering permit as required by the St . Johns <br /> 01025-2 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1336=Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Cncrifirnfinnc rinr <br />
The URL can be used to link to this page
Your browser does not support the video tag.