Laserfiche WebLink
Addendum #1 11 -06-2013 <br /> SECTION — 2 - EROSION CONTROL AND TREATMENT OF DEWATERING WATER <br /> AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off-site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project' s construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , "Best Management <br /> Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment <br /> Control Inspector' s Manual , and other references as may be required by regulatory <br /> permits . ( http : //www . dep . state .fl . us ./water/nonpollnt/docs/erosion/erosion - <br /> inspectors-manual . pdfl <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively, the OWNER may halt the CONTRACTOR' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering" of the Florida Erosion and Sediment Control Inspector' s Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay <br /> for all other required permits , licenses , sampling , and tests . Permits the <br /> CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long-term and/or short-term dewatering permit as required by the St . Johns <br /> 01025-2 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1336=Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Cncrifirnfinnc rinr <br />