My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 11 -06-2013 <br /> donate them to the County free of charge . ( See Paragraph C , Special Provisions ) <br /> The Contractor shall transport the culverts to the County's storage yard . All metal <br /> castings for catch basins , manholes , or other structures shall be carefully removed <br /> and stored in the County' s Storage Yard if they are deemed salvageable by the <br /> Engineer. The excavated materials shall be removed from the job site and disposed in <br /> a location designated or approved by the Owner. Any culverts , structures or any <br /> material excavated or removed from the project site under clearing and grubbing <br /> deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the <br /> Contractor. Where required , suitable material as approved by the Engineer shall then <br /> be backfilled and compacted to restore the original contour of the ground . The fill <br /> material shall be backfilled and compacted in accordance with Section 120 of these <br /> specifications . <br /> H . No additional payment will be made , nor will additional work, or change orders be <br /> authorized for work needed to remove , relocate , protect , or otherwise account for in <br /> the construction of the work depicted in the plans , for any feature , or item that would <br /> be apparent from a careful inspection of the site and review of the plans , even though <br /> such feature or item is not specifically called out in the plans . It is therefore essential <br /> the contractor make such inspection and review. <br /> I . The unit price bid for this item shall include the cost of all labor, tools , and equipment <br /> necessary to excavate , remove , and dispose of those items as directed by the <br /> Engineer and where designated on the Drawings . The cost of restoration and backfill <br /> and compaction for the specific area of removal shall also be included under this item . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 5 - Clearing and Grubbing ( Stripping or Exterminating of Existing Sod ) — <br /> Per Acre <br /> SECTION — 6 - EXCAVATION AND EMBANKMENT <br /> A . Earthwork , including earthwork for drives outside the right-of-way limits , shall be <br /> paid for as embankment . Cost shall include all work specified in this section and <br /> Section 120 of the Standard Specifications . Such price and payment shall <br /> specifically include all cost of any roadway, lateral ditch or canal , and final dressing <br /> operations . <br /> Be Earthwork quantities shall be considered as in- place material with no shrinkage or <br /> expansion factors . <br /> C . Subsoil Excavation - Any excavation below the proposed bottom elevation of the select <br /> fill , isolated swale bottom locations , isolated locations for pipe installations and as <br /> approved by the engineer shall be paid for as subsoil excavation . Approximately 2 . 0 ft <br /> of subsoil excavation is required in sublateral canals . Cost of replacement <br /> embankment shall be included in cost of subsoil excavation . Contractor shall <br /> coordinate with county representative prior to any subsoil excavation . <br /> D . Embankment - General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 120-7 . 2 : <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is modified <br /> 01025-21 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documentsWDDENDUMS\Technical <br /> Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.