My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br /> A . The CONTRACTOR shall be responsible for and make good all damage to <br /> pavement beyond the limits of this Contract , buildings , telephone or other <br /> cables , water pipes , sanitary pipes , or other structures which may be <br /> encountered , whether or not shown on the Drawings . <br /> B . Information shown on the Drawings as to the location of existing utilities has <br /> been prepared from the most reliable data available to the Engineer . This <br /> information is not guaranteed , however , and it shall be this CONTRACTOR Is <br /> responsibility to determine the location , character and depth of any existing <br /> utilities . He shall assist the utility companies , by every means possible to <br /> determine said locations . Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities . <br /> 107 ADJUSTMENTS OF UTILITY CASTINGS , COVERS AND BOXES <br /> A . All existing utility castings , including valve boxes , junction boxes , manholes , pull <br /> boxes , inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work . <br /> B . The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing . CONTRACTOR shall make available survey reference markers to <br /> the various utility companies . <br /> + + END OF SECTION + + <br /> 01541 -5 F : \Public Works\ENGINEERING DIVISION <br /> PROJECTS\1336-Gifford Senior BallfieldWdmin\bid documents\MasterContract\Contract Documents\01541 - <br /> Protection of Property . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.