ARTICLE 13 - TESTS AND INSPECTIONS ; furnish ENGINEER the required certificates of inspec.
<br /> CORRECTION , REMOVAL OR ACCEPTANCE OF tion or approval .
<br /> DEFECTIVE WORK
<br /> D . CONTRACTOR shall be responsible for
<br /> arranging and obtaining and shall pay all costs in
<br /> 13 . 01 Notice of Defects connection with any inspections , tests , or approvals
<br /> required for OWNER Is and ENGINEER ' s acceptance
<br /> A. Prompt notice of all defective Work of which of materials or equipment to be incorporated in
<br /> the
<br /> OWNER or ENGINEER has actual knowledge will be Work ; or acceptance of materials , mix designs , or
<br /> given to CONTRACTOR . All defective Work may be equipment submitted for approval prior to
<br /> rejected , corrected , or accepted as provided in this CONTRACTOR ' s purchase thereof for incorporation
<br /> Article 13 . in the Work . Such inspections , tests , or approvals
<br /> shall be performed by organizations acceptable to
<br /> 13 . 02 Access to Work OWNER and ENGINEER .
<br /> A. OWNER , ENGINEER , ENGINEER ' s Con - E . If any Work (or the work of others) that is to
<br /> sultants, other representatives and personnel of be inspected , tested , or approved is covered by CON-
<br /> OWNER , independent testing laboratories , and TRACTOR without written concurrence of ENGI -
<br /> governmental agencies with jurisdictional interests will NEER , it must, if requested by ENGINEER , be uncov.
<br /> have access to the Site and the Work at reasonable ered for observation .
<br /> times for their observation , inspecting , and testing .
<br /> CONTRACTOR shall provide them proper and safe F . Uncovering Work as provided in paragraph
<br /> conditions for such access and advise them of 13 . 03 . E shall be at CONTRACTOR ' s expense unless
<br /> CONTRACTOR's Site safety procedures and CONTRACTOR has given ENGINEER timely notice
<br /> programs so that they may comply therewith as of CONTRACTOR's intention to cover the same and
<br /> applicable. ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice .
<br /> 13 . 03 Tests and Inspections
<br /> 13 . 04 Uncovering Work
<br /> A. CONTRACTOR shall give ENGINEER timely
<br /> notice of readiness of the Work for all required A. If any Work is covered contrary to the written
<br /> inspections , tests , or approvals and shall cooperate request of ENGINEER , it must, if requested by
<br />ENGI -
<br /> with inspection and testing personnel to facilitate NEER , be uncovered for ENGINEER's observation
<br /> required inspections or tests. and replaced at CONTRACTOR ' s expense .
<br /> B . OWNER shall employ and –Pay—fer the B . If ENGINEER considers it necessary or
<br /> BeWiGes of an independeRt testing labeFatery to advisable that covered Work be observed by ENGI -
<br /> NEER or inspected or tested by others , CONTRAC-
<br /> TOR , at ENGINEER ' s request, shall uncover, expose ,
<br /> or otherwise make available for observation , inspec-
<br /> t , fer insPest,ers , tests , or appFGV tion , or testing as ENGINEER may require , that
<br /> r0evered by paFagFaphr, 12 03 Q and 13 . 03 . D portion of the Work in question , furnishing all neces-
<br /> belew ; sary labor, material , and equipment. If it is found that
<br /> such Work is defective , CONTRACTOR shall pay all
<br /> 2 , that 1396h.; imn. urred. in GenneGt*GR W Claims , costs , losses , and damages ( including but not
<br /> limited to all fees and charges of engineers , architects ,
<br /> paragFaph 13 , 04 . 6 Shall be paid as PFGV*ded on attorneys , and other professionals and all court
<br /> or
<br /> said paragFaph 13 , 04 . 13 ; and arbitration or other dispute resolution costs) arising out
<br /> of or relating to such uncovering , exposure , observa-
<br /> tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction ( including but not
<br /> limited to all costs of repair or replacement of work of
<br /> C . If Laws or Regulations of any public body others) ; and OWNER shall be entitled to an
<br /> having jurisdiction require any Work (or part thereof) appropriate decrease in the Contract Price. If
<br /> the
<br /> specifically to be inspected , tested , or approved by an parties are unable to agree as to the amount thereof,
<br /> employee or other representative of such public body, OWNER may make a Claim therefor as provided in
<br /> CONTRACTOR shall assume full responsibility for paragraph 10 . 05 . If, however, such Work is not found
<br /> arranging and obtaining such inspections , tests , or to be defective , CONTRACTOR shall be allowed an
<br /> approvals , pay all costs in connection therewith , and increase in the Contract Price or an extension
<br /> of the
<br /> 00700 - General Conditions REV 5-10-13. doc
<br /> 00700 - 35