Laserfiche WebLink
Contract Times ( or Milestones ) , or both , directly work Gf other-is or other land oF areas resulting there - <br /> attributable to such uncovering , exposure , from- If CONTRACTOR does not promptly comply <br /> observation , inspection , testing , replacement, and with the terms of such instructions , or in an <br /> reconstruction . If the parties are unable to agree as to emergency where delay would cause serious risk of <br /> the amount or extent thereof, CONTRACTOR may loss or damage , OWNER may have the defective <br /> make a Claim therefor as provided in paragraph Work corrected or repaired or may have the rejected <br /> 10 . 05 . Work removed and replaced , and all Claims , costs , <br /> losses , and damages ( including but not limited to all <br /> 13 . 05 OWNER May Stop the Work fees and charges of engineers , architects , attorneys , <br /> and other professionals and all court or arbitration or <br /> Al If the VV9Fk as defeGtive , or CONTRACTOR other dispute resolution costs ) arising out of or relating <br /> to such correction or repair or such removal and <br /> materials nr equipment nr fails to perform the Werk in replacement ( including but not limited to all <br /> costs of <br /> repair or replacement of work of others) will be paid by <br /> the i2. n. Rtr.;;g.t DoGumentis , OWNER may order GON CONTRACTOR . <br /> TRACTOR to stop the WaFk, oF any portion theFeof <br /> until rause „ s the fpr cnh order habeen elirrinated ' B . <br /> however,' this right of OWNER to c+np the Werk shall <br /> item of equipment is plar.,ed. On rUemfim <br /> Rot Hiverice to any d „fii on the Hart of 01A/AICD to <br /> everniee this; right for the benefit of G. G. NTDAGTOR <br /> any SubG9ntFaGt9F, any Supplier, any other individual earlier date Of se provided an the SPISIGAGations <br /> or b <br /> or or any su ” for, eF employee or agent e Written Amendment <br /> entity, ' <br /> C . Where defective Work (and damage to other <br /> 13 . 06 Correction or Removal of Defective Work Work resulting therefrom ) has been corrected or <br /> removed and replaced under this paragraph 13 . 07 , <br /> A. CONTRACTOR shall correct all defective the correction period hereunder with respect to such <br /> Work , whether or not fabricated , installed , or Work will be extended for an additional period of one <br /> completed , or, if the Work has been rejected by ENGI - year after such correction or removal and replacement <br /> NEER , remove it from the Project and replace it with has been satisfactorily completed . <br /> Work that is not defective. CONTRACTOR shall pay <br /> all Claims , costs , losses , and damages ( including but D . CONTRACTOR' s obligations under this <br /> not limited to all fees and charges of engineers , paragraph 13 . 07 are in addition to any other obligation <br /> architects , attorneys , and other professionals and all or warranty. The provisions of this paragraph 13 <br />. 07 <br /> court or arbitration or other dispute resolution costs) shall not be construed as a substitute for or <br /> a waiver <br /> arising out of or relating to such correction or removal of the provisions of any applicable statute of limitation <br /> ( including but not limited to all costs of repair or or repose. <br /> replacement of work of others) . <br /> 13 . 08 Acceptance of Defective Work <br /> 13 . 07 Correction Period <br /> A. If, instead of requiring correction or removal <br /> A if within one „ear after the da+e of c „ brO +antial and replacement of defective Work, OWNER (and <br />, <br /> prior to ENGINEER's recommendation of final pay- <br /> ment, ENGINEER) prefers to accept it, OWNER may <br /> any appliGable SpeGial guarantee required by the do so . CONTRACTOR shall pay all Claims, costs , <br /> losses , and damages ( including but not limited to all <br /> GO .AtraArUt DGIGIUMeRtS , any Work 06 fOURd to be fees and charges of engineers , architects , attorneys , <br /> defeGtive or if the repair of any damages to the land and other professionals and all court or arbitration <br /> or <br /> other dispute resolution costs) attributable to <br /> OWNER's evaluation of and determination to accept <br /> such defective Work (such costs to be approved by <br /> ENGINEER as to reasonableness) and the diminished <br /> to OWNER and in aGGGFdaRGe with OWNER I s wFffitten value of the Work to the extent not otherwise paid by <br /> n6tFUGtiGns : ( 6 ) repair SUGh defel3tive land or or CONTRACTOR pursuant to this sentence. If any <br /> ►t�,TeGts�a��+iceWork er ;,f the defeG+� such acceptance occurs prior to ENGINEER's recom - <br /> \ A ►nrL bac been relented by O\ A/AICD remove it from mendation of final payment, a Change Order will <br /> be <br /> the PFojeGt and replaGe it with Work -that is; not issued incorporating the necessary revisions in the <br /> Contract Documents with respect to the Work, and <br /> FernGve and FeplaGe any damage to other VVc) Fk , to the. OWNER shall be entitled to an appropriate decrease <br /> 00700 - General Conditions REV 5- 10- 13. doc <br /> 00700 - 36 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00700 - General Conditions REV <br /> 5-10- <br /> 13. doc <br />