Laserfiche WebLink
QUESTION NO . 10 <br /> Do you have anyone installing the clay or do you want us to ? <br /> ANSWER NO. 10 <br /> All work pertaining to the project will be performed by the Contractor, including removal of existing clay <br /> and installation of existing and new clay to proposed grades . <br /> QUESTION NO. 11 <br /> I did not see anything in the specs about laser grading, is it required ? <br /> ANSWER NO . 11 <br /> Laser grading is required as indicated on the Itemized Bid Schedule . <br /> QUESTION NO . 12 <br /> Does the county have any clay we can use if more is needed, if not did they provide where they <br /> get clay <br /> from so we can match it ? <br /> ANSWER NO . 12 <br /> Contractor is required to provide clay and install to proper grade . It is the Contractor' s responsibility <br /> to <br /> closely match existing clay . <br /> ADDITIONS AND CLARIFICATIONS <br /> 1 . Alternate # 2 is added to the Itemized Bid Schedule for 2 Each — 20' x 36' Aluminum <br /> Shed . <br /> Technical Provisions 01025 = 28 is added . <br /> 2 . Alternate # 1 is modified to show Section 1A instead of Al and 1B instead of A2 . Revised sheet <br /> is <br /> added . <br /> 3 . Division 2 — Technical Provisions (Table of Contents ) is revised as follows : <br /> Section No . 9 Performance Turf — Change to Section No . 11 Performance Turf <br /> Section No . 11 Landscape Irrigation — Change to Section No . 13 Landscape Irrigation <br /> Section No . 14 Concrete — Change to Section No . 16 Concrete <br /> Section No . 15 Fencing — Change to Section No . 18 Fencing <br /> Add Alternate Bid 1 Lighting <br /> Add Alternate Bid 2 Sheds <br /> Page 4 of 6 <br /> FAPublic Worksl ENGINEERING DMSIONPROJECTSI M&Gifford Senior Ba11fieldW dminl bid documentA4DDENDUMS[ 4DDENDUM NO ] 11-06. <br />