My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
337-7 .3 Temperature Requirements for FC-5 : <br /> 337-7.3 . 1 Air Temperature at Laydown : Spread the mixture only when the air <br /> temperature (the temperature in the shade away from artificial heat) is at or above 65 °F . As an <br /> exception, place the mixture at temperatures no lower than 60°F , only when approved by the <br /> Engineer based on the Contractor ' s demonstrated ability to achieve a satisfactory surface texture <br /> and appearance of the finished surface . The minimum ambient temperature may be further reduced <br /> to 55 °F when using warm mix technology, if agreed to by both the Engineer and the Contractor. <br /> 3374.3 .2 Temperature of the Mix : Heat and combine the asphalt binder and <br /> aggregate in a manner to produce a mix having a temperature, when discharged from the plant, <br /> meeting the requirements of 330- 6 . 3 . Meet all requirements of 330- 9 . 1 . 2 at the roadway. The <br /> target mixing temperature shall be established at 320°F for mixtures utilizing ARB - 12 asphalt <br /> binder. For mixtures utilizing PG 76-22 asphalt binder, the target mixing temperature shall be <br /> established by the Contractor. The target mixing temperature may be reduced when using warm mix <br /> technology. <br /> 337-7.4 Compaction of FC-5 : Provide two , static steel -wheeled rollers , with an effective <br /> compactive weight in the range of 135 to 200 PLI, determined as follows : <br /> PLI — TotalWeightof Roller (pounds) <br /> TotalWidthof Drums ( inches) <br /> (Any variation of this equipment requirement must be approved by the Engineer. ) Establish an <br /> appropriate rolling pattern for the pavement in order to effectively seat the mixture without <br /> crushing the aggregate . In the event that the roller begins to crush the aggregate , reduce the <br /> number of coverages or the PLI of the rollers . If the rollers continue to crush the aggregate, use a <br /> tandem steel-wheel roller weighing not more than 135 lb . per linear inch (PLI) of drum width . <br /> 337-7.5 Temperature Requirements for FC-9 .5 and FC42 . 5 : <br /> 337-7. 5 . 1 Air Temperature at Laydown : Spread the mixture only when the air <br /> temperature (the temperature in the shade away from artificial heat) is at or above 45 °F . The <br /> minimum ambient temperature may be reduced by 5 °F when using warm mix technology, if agreed <br /> to by both the Engineer and the Contractor. <br /> 337-7 . 5 . 2 Temperature of the Mix : Heat and combine the asphalt binder and <br /> aggregate in a manner to produce a mix having a temperature, when discharged from the plant, <br /> meeting the requirements of 330- 6 . 3 . Meet all requirements of 330- 9 . 1 . 2 at the roadway. <br /> 337-7 . 6 Prevention of Adhesion : To minimize adhesion to the drum during the rolling <br /> operations , the Contractor may add a small amount of liquid detergent to the water in the roller. <br /> At intersections and in other areas where the pavement may be subjected to cross - <br /> traffic before it has cooled, spray the approaches with water to wet the tires of the approaching <br /> vehicles before they cross the pavement . <br /> 337-7. 7 Transportation Requirements of Friction Course Mixtures : Cover all loads <br /> of friction course mixtures with a tarpaulin, or waterproof cover, meeting requirements of 320 - <br /> 5 . 4 . <br /> 337- 7. 8 Asphalt Rubber Binder Requirements : Meet the requirements of Section 336 <br /> Asphalt Rubber Binder, particularly noting testing and action requirements to be met at the <br /> project site . <br /> - 106 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> - �_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.