2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
337.8 Thickness of Friction Courses . <br /> 337-8 . 1 FC42 .5 and FC -9 . 5 : The thickness of the friction course layer will be the plan <br /> thickness as shown in the Contract Documents . For construction purposes , the plan thickness <br /> will be converted to spread rate as defined in 3344 . 4 . <br /> Q Plan quantities are based on a Gm,,, of 2 . 540 , corresponding to a spread rate of 110 <br /> lbs . per square yard per inch . Pay quantities will be based on the actual maximum specific <br /> gravity of the mix being used. <br /> 337-8 .2 FG5 : The total thickness of the FC - 5 layer will be the plan thickness as shown <br /> in the Contract Documents . For construction purposes , the plan thickness will be converted to <br /> spread rate based on the combined aggregate bulk specific gravity of the asphalt mix being used <br /> as shown in the following equation : <br /> Spread rate (lbs . per square yard) = t x Gsb x 40 . 5 <br /> Where : t = Thickness (in. ) (Plan thickness) <br /> Gsb = Combined aggregate bulk specific gravity from the verified <br /> mix design <br /> The weight of the mixture shall be determined as provided in 320 -2 . 2 . <br /> Plan quantities are based on a Gsb of 2 . 635 , corresponding to a spread rate of <br /> 80 lbs . per square yards . Pay quantities will be based on the actual combined aggregate bulk <br /> specific gravity (Gsb) of the mix being used . <br /> 337-9 Special Equipment Requirements for FC-5 . <br /> 337-9 . 1 Fiber Supply System : Use a separate feed system to accurately proportion the <br /> required quantity of mineral fibers into the mixture in such a manner that uniform distribution is <br /> obtained. Interlock the proportioning device with the aggregate feed or weigh system to maintain <br /> the correct proportions for all rates of production and batch sizes . Control the proportion of fibers <br /> to within plus or minus 10 % of the amount of fibers required . Provide flow indicators or sensing <br /> devices for the fiber system, interlocked with plant controls so that the mixture production will <br /> be interrupted if introduction of the fiber fails . <br /> When a batch plant is used, add the fiber to the aggregate in the weigh hopper or <br /> as approved and directed by the Engineer. Increase the batch dry mixing time by 8 to 12 seconds , <br /> or as directed by the Engineer, from the time the aggregate is completely emptied into the <br /> pugmill . Ensure that the fibers are uniformly distributed prior to the addition of asphalt rubber <br /> into the pugmill . <br /> When a drum-mix plant is used, add and uniformly disperse the fiber with the <br /> aggregate prior to the addition of the asphalt rubber. Add the fiber in such a manner that it will <br /> not become entrained in the exhaust system of the drier or plant . <br /> 337-9 .2 Hydrated Lime Supply System : For FC - 5 mixes containing granite , use a <br /> separate feed system to accurately proportion the required quantity of hydrated lime into the <br /> mixture in such a manner that uniform coating of the aggregate is obtained prior to the addition <br /> of the asphalt rubber. Add the hydrated lime in such a manner that it will not become entrained <br /> in the exhaust system of the drier or plant. Interlock the proportioning device with the aggregate <br /> feed or weigh system to maintain the correct proportions for all rates of production and batch <br /> sizes and to ensure that all mixture produced is properly treated with hydrated lime . Control the <br /> proportion of hydrated lime to within plus or minus 10 % of the amount of hydrated lime <br /> required. Provide and interlock flow indicators or sensing devices for the hydrated lime system <br /> - 107 - <br /> FPID ( S ) : 4231864 - 58 - 01 <br /> i" <br />