337.8 Thickness of Friction Courses . <br /> 337-8 . 1 FC42 .5 and FC -9 . 5 : The thickness of the friction course layer will be the plan <br /> thickness as shown in the Contract Documents . For construction purposes , the plan thickness <br /> will be converted to spread rate as defined in 3344 . 4 . <br /> Q Plan quantities are based on a Gm,,, of 2 . 540 , corresponding to a spread rate of 110 <br /> lbs . per square yard per inch . Pay quantities will be based on the actual maximum specific <br /> gravity of the mix being used. <br /> 337-8 .2 FG5 : The total thickness of the FC - 5 layer will be the plan thickness as shown <br /> in the Contract Documents . For construction purposes , the plan thickness will be converted to <br /> spread rate based on the combined aggregate bulk specific gravity of the asphalt mix being used <br /> as shown in the following equation : <br /> Spread rate (lbs . per square yard) = t x Gsb x 40 . 5 <br /> Where : t = Thickness (in. ) (Plan thickness) <br /> Gsb = Combined aggregate bulk specific gravity from the verified <br /> mix design <br /> The weight of the mixture shall be determined as provided in 320 -2 . 2 . <br /> Plan quantities are based on a Gsb of 2 . 635 , corresponding to a spread rate of <br /> 80 lbs . per square yards . Pay quantities will be based on the actual combined aggregate bulk <br /> specific gravity (Gsb) of the mix being used . <br /> 337-9 Special Equipment Requirements for FC-5 . <br /> 337-9 . 1 Fiber Supply System : Use a separate feed system to accurately proportion the <br /> required quantity of mineral fibers into the mixture in such a manner that uniform distribution is <br /> obtained. Interlock the proportioning device with the aggregate feed or weigh system to maintain <br /> the correct proportions for all rates of production and batch sizes . Control the proportion of fibers <br /> to within plus or minus 10 % of the amount of fibers required . Provide flow indicators or sensing <br /> devices for the fiber system, interlocked with plant controls so that the mixture production will <br /> be interrupted if introduction of the fiber fails . <br /> When a batch plant is used, add the fiber to the aggregate in the weigh hopper or <br /> as approved and directed by the Engineer. Increase the batch dry mixing time by 8 to 12 seconds , <br /> or as directed by the Engineer, from the time the aggregate is completely emptied into the <br /> pugmill . Ensure that the fibers are uniformly distributed prior to the addition of asphalt rubber <br /> into the pugmill . <br /> When a drum-mix plant is used, add and uniformly disperse the fiber with the <br /> aggregate prior to the addition of the asphalt rubber. Add the fiber in such a manner that it will <br /> not become entrained in the exhaust system of the drier or plant . <br /> 337-9 .2 Hydrated Lime Supply System : For FC - 5 mixes containing granite , use a <br /> separate feed system to accurately proportion the required quantity of hydrated lime into the <br /> mixture in such a manner that uniform coating of the aggregate is obtained prior to the addition <br /> of the asphalt rubber. Add the hydrated lime in such a manner that it will not become entrained <br /> in the exhaust system of the drier or plant. Interlock the proportioning device with the aggregate <br /> feed or weigh system to maintain the correct proportions for all rates of production and batch <br /> sizes and to ensure that all mixture produced is properly treated with hydrated lime . Control the <br /> proportion of hydrated lime to within plus or minus 10 % of the amount of hydrated lime <br /> required. Provide and interlock flow indicators or sensing devices for the hydrated lime system <br /> - 107 - <br /> FPID ( S ) : 4231864 - 58 - 01 <br /> i" <br />