4�i <br /> pretreated in conformance with these specifications . Include also the date the material was <br /> pretreated. <br /> 33740 Failing Material. <br /> Meet the requirements of 334 - 5 . 9 . For FC - 5 , use the Master Production Range defined in <br /> Table 337 -2 in lieu of Table 334 - 5 . <br /> 33741 Method of Measurement. <br /> For the work specified under this Section (including the pertinent provisions of <br /> Sections 320 and 330) , the quantity to be paid for will be the weight of the mixture , in tons . The <br /> pay quantity will be based on the project average spread rate , limited to a maximum of 105 % of <br /> the spread rate determined in accordance with 337 - 8 or as set by the Engineer. The project <br /> average spread rate is calculated by totaling the arithmetic mean of the average daily spread rate <br /> values for each layer. <br /> The bid price for the asphalt mix will include the cost of the asphalt binder (asphalt <br /> rubber (or polymer) , asphalt cement, ground tire rubber, anti- stripping agent, blending and <br /> handling) and the tack coat application as directed in 300 - 8 , as well as fiber stabilizing additive <br /> and hydrated lime (if required) . There will be no separate payment or unit price adjustment for <br /> the asphalt binder material in the asphalt mix . The weight will be determined as provided in <br /> 320-2 (including the provisions for the automatic recordation system) . <br /> Prepare a Certification of Quantities , using the Department ' s current approved form, for <br /> the certified asphalt concrete friction course pay item . Submit this certification to the Engineer <br /> no later than Twelve O ' clock noon Monday after the estimate cut-off or as directed by the <br /> Engineer, based on the quantity of asphalt produced and accepted on the roadway per Contract. <br /> The certification must include the Contract Number, FPID Number, Certification Number, <br /> Certification Date , period represented by Certification and the tons produced for each asphalt pay <br /> item . <br /> 33742 Basis of Payment. <br /> 33742 . 1 General : Price and payment will be full compensation for all the work <br /> specified under this Section (including the applicable requirements of Sections 320 and 330) . <br /> Based upon the quality of the material, a pay adjustment will be applied to the bid <br /> price of the material as determined on a LOT by LOT basis . The pay adjustment will be assessed <br /> by calculating a Pay Factor for individual quality characteristics . The pay adjustment will be <br /> computed by multiplying a Composite Pay Factor for the LOT by the bid price per ton . Perform <br /> all calculations with the Department ' s Asphalt Plant - Pay Factor Worksheets . <br /> 337- 12 . 2 FC-9 .5 and FC42 . 5 : Meet the requirements of 334 - 8 . <br /> 33742 .3 FC-5 : Meet the requirements of 334 - 8 with the following exceptions : <br /> 1 . Pay factors will be calculated for asphalt binder content and the percentages <br /> passing the 3 /8 inch, the No . 4 , and the No . 8 sieves only. <br /> 2 . The Small Quantity Pay Table for FC - 5 Mixtures replaces the Small Quantity <br /> Pay Table for Dense Graded Mixtures in the Department ' s Asphalt Plant - Pay Factor <br /> Worksheets . <br /> 3 . Table 337 -3 replaces Table 334 - 7 . <br /> 4 . The Composite Pay Factor equation in 334 - 8 . 3 is replaced with the following : <br /> CPF = [ (0 . 20 x PF 3 / 8 inch) + (0 . 30 x PF No . 4) + (0 . 10 x PF No . 8 ) + <br /> - 109 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />