My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4�i <br /> pretreated in conformance with these specifications . Include also the date the material was <br /> pretreated. <br /> 33740 Failing Material. <br /> Meet the requirements of 334 - 5 . 9 . For FC - 5 , use the Master Production Range defined in <br /> Table 337 -2 in lieu of Table 334 - 5 . <br /> 33741 Method of Measurement. <br /> For the work specified under this Section (including the pertinent provisions of <br /> Sections 320 and 330) , the quantity to be paid for will be the weight of the mixture , in tons . The <br /> pay quantity will be based on the project average spread rate , limited to a maximum of 105 % of <br /> the spread rate determined in accordance with 337 - 8 or as set by the Engineer. The project <br /> average spread rate is calculated by totaling the arithmetic mean of the average daily spread rate <br /> values for each layer. <br /> The bid price for the asphalt mix will include the cost of the asphalt binder (asphalt <br /> rubber (or polymer) , asphalt cement, ground tire rubber, anti- stripping agent, blending and <br /> handling) and the tack coat application as directed in 300 - 8 , as well as fiber stabilizing additive <br /> and hydrated lime (if required) . There will be no separate payment or unit price adjustment for <br /> the asphalt binder material in the asphalt mix . The weight will be determined as provided in <br /> 320-2 (including the provisions for the automatic recordation system) . <br /> Prepare a Certification of Quantities , using the Department ' s current approved form, for <br /> the certified asphalt concrete friction course pay item . Submit this certification to the Engineer <br /> no later than Twelve O ' clock noon Monday after the estimate cut-off or as directed by the <br /> Engineer, based on the quantity of asphalt produced and accepted on the roadway per Contract. <br /> The certification must include the Contract Number, FPID Number, Certification Number, <br /> Certification Date , period represented by Certification and the tons produced for each asphalt pay <br /> item . <br /> 33742 Basis of Payment. <br /> 33742 . 1 General : Price and payment will be full compensation for all the work <br /> specified under this Section (including the applicable requirements of Sections 320 and 330) . <br /> Based upon the quality of the material, a pay adjustment will be applied to the bid <br /> price of the material as determined on a LOT by LOT basis . The pay adjustment will be assessed <br /> by calculating a Pay Factor for individual quality characteristics . The pay adjustment will be <br /> computed by multiplying a Composite Pay Factor for the LOT by the bid price per ton . Perform <br /> all calculations with the Department ' s Asphalt Plant - Pay Factor Worksheets . <br /> 337- 12 . 2 FC-9 .5 and FC42 . 5 : Meet the requirements of 334 - 8 . <br /> 33742 .3 FC-5 : Meet the requirements of 334 - 8 with the following exceptions : <br /> 1 . Pay factors will be calculated for asphalt binder content and the percentages <br /> passing the 3 /8 inch, the No . 4 , and the No . 8 sieves only. <br /> 2 . The Small Quantity Pay Table for FC - 5 Mixtures replaces the Small Quantity <br /> Pay Table for Dense Graded Mixtures in the Department ' s Asphalt Plant - Pay Factor <br /> Worksheets . <br /> 3 . Table 337 -3 replaces Table 334 - 7 . <br /> 4 . The Composite Pay Factor equation in 334 - 8 . 3 is replaced with the following : <br /> CPF = [ (0 . 20 x PF 3 / 8 inch) + (0 . 30 x PF No . 4) + (0 . 10 x PF No . 8 ) + <br /> - 109 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.