My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> lots . The Department may conduct a Pavement Condition Survey of the value added pavement <br /> following the final acceptance of the project, and at intermediate times throughout the warranty <br /> period with findings provided when considered by the Department to be the obligation of the <br /> Responsible Party. <br /> The final survey, if determined by the Engineer to be necessary, will be conducted <br /> before the end of the warranty period with results provided to the Responsible Party for those <br /> conditions exceeding contract threshold values requiring remedial action that the Department <br /> believes to be an obligation of the Responsible Party. The Department will be responsible for all <br /> costs associated with the surveys . <br /> If the survey findings , intermediate or final , are to be disputed by the Responsible <br /> Party, written notification must be provided to the Engineer within 30 calendar days of the date <br /> of receipt of the information from the Department. <br /> 5 During the warranty period, the Responsible Party may monitor the project using <br /> nondestructive methods and may participate with the Department in the Pavement Condition <br /> Surveys upon request . The Responsible Party shall not conduct any coring, milling or other <br /> destructive methods without prior approval by the Engineer. <br /> 338-5 .2 Category 1 Pavement : For purposes of this Specification, "Category 1 <br /> Pavement" is defined as mainline roadways , access roads and frontage roads with a design speed <br /> of 55 mph and greater. <br /> Threshold values and associated remedial work for Category 1 Value Added <br /> Asphalt Pavement are specified in Table 338 - 1 . <br /> - 111 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br /> z <br />
The URL can be used to link to this page
Your browser does not support the video tag.