IV <br /> 6 , 501 — 8 , 500 psi 1 , 275 psi <br /> Greater than 8 , 500 psi 1 , 360 psi <br /> SUBARTICLE 346 - 9 . 2 (Pages 334 — 335 ) is deleted and the following substituted : <br /> ,` r 346-9 .2 Sampling Frequency : <br /> As a minimum, sample and test concrete of each design mix for water to <br /> cementitious materials ratio, air content, temperature, slump and compressive strength once per <br /> LOT as defined by Table 8 . When more than one concrete production facility is used for the <br /> same mix design, describe the method of sampling, testing and LOT numbering in the QC Plan . <br /> The Engineer will randomly verify one of every four consecutive LOTs of each design mix <br /> based on a random number generator. The Department may perform Independent Verification <br /> testing to verify compliance with specification requirements . All QC activities , calculations , and <br /> inspections will be randomly confirmed by the Department. <br /> TABLE 8IV <br /> Class Concrete Maximum LOT Size <br /> I one day ' s production �` <br /> I (Pavement) 250 lane ft, or one day ' s production, whichever is <br /> less <br /> II, lI (Bridge Deck) , III, IV, V ( Special) , 3 <br /> V, VI 50 yd , or one days production , whichever is less <br /> N (Drilled Shaft) 50 yd3 , or two hours between placements , whichever <br /> is less <br /> III ( Seal) Each Seal placement <br /> 346-9.2 . 1 Reduced Frequency for Acceptance Tests : When ten consecutive I VI <br /> strength test results from the same mix design for a Class N or higher class of concrete are <br /> produced at the same concrete production facility, on a given Contract have all been verified and <br /> have attained an average strength greater than two standard deviations above the specified <br /> minimum, then the LOT may represent a maximum production quantity of 100 yd3 . When five <br /> consecutive strength test results from the same mix design for a Class III or lower class of <br /> concrete is produced at the same concrete production facility on a given Contract have all been <br /> verified and have attained an average strength greater than two standard deviations above the <br /> specified minimum, the LOT may represent a maximum production quantity of 100 yd3 . <br /> The average of the consecutive compressive strength test results , based on <br /> the class of concrete, can be established using historical data from a previous Department <br /> project. The data must also represent the same prime/subcontractor. The tests from the previous <br /> Department project must be within the last 60 calendar days or may also be established by a <br /> succession of samples on the current project. Only one sample can be taken from each LOT . Test <br /> data must be from a laboratory meeting the requirements of Section 105 . <br /> If at any time a strength test is not verified and/or the average strength of <br /> the previous ten or five consecutive samples based on the class of concrete described above, <br /> - 124- <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br /> 7� 5777b <br /> eletIV <br /> iiy c, " 1 ✓, '` '� �' ' 1rr ? �"3" r <br /> " . . 1, r. "' . 5., ; . _ _ V ? .,"s. �. < <.. P4�W? `'`.. f.".� r .,. c ,. .. ` , ,. � �._ . , ,, , , <br /> . , , � . r . , f e _ . . �. <br />