t ; <br /> from the same mix design and the same production facility is less than the specified minimum R` <br /> plus two standard deviations , the maximum production quantity represented by the LOT will <br /> return to 50 yd3 . In order to reinitiate reduced frequency, a new set of strength test results will be <br /> required. <br /> k : <br /> f <br /> SUBARTICLE 346 - 9 . 4 (Pages 335 — 336) is deleted and the following substituted : <br /> 346-9 .4 Acceptance of Concrete : <br /> Accept or reject concrete on the basis of plastic property results in accordance <br /> with 346 - 6 .4 . <br /> Ensure that the hardened concrete strength test results are obtained in accordance <br /> with 346 -9 . 3 . Do not discard a cylinder strength test result based on low strength (strength below <br /> the specified minimum strength as h the provisions of this Section) . <br /> per <br /> When one of the three QC cylinders from a LOT is lost, damaged or destroyed, <br /> determination of compressive strength will be made by averaging the remaining two cylinders . If <br /> more than one QC cylinder from a LOT is lost, damaged or destroyed, the Contractor will core <br /> the structure at no additional expense to the Department to determine the compressive strength . [ <br /> Acceptance of LOT may be based on verification data at the discretion of the Engineer . Obtain <br /> the approval of the Engineer to core, and of the core location prior to coring. <br /> For each QC cylinder that is lost, damaged or destroyed, payment for that LOT <br /> will be reduced by $ 750 . 00 per 1 , 000 psi of the specified design strength [Example : loss of two <br /> Class IV (Drill Shaft) QC cylinders that has no verification data will require the element to be <br /> cored and a penalty will be assessed (4 , 000 psi / 1 , 000 psi) x $ 750 x 2 = $ 6 , 000 . This reduction <br /> will be in addition to any pay adjustment for low strength . <br /> When QC compressive strength test results are not verified, the resolution <br /> procedure will be used to accept or reject the concrete . Maintain the "hold" cylinders until the <br /> verification of the compressive strength test results . <br /> When QC test results are verified, the Engineer will accept the concrete based on <br /> QC test results . The Engineer will accept at full pay only LOTs of concrete represented by <br /> plastic property results which meet the requirements of the approved mix design and strength test <br /> results which equal or exceed the respective specified minimum strength . <br /> SUBARTICLE 346 - 9 . 6 (Page 337 ) is deleted and the following substituted : <br /> 346-9 . 6 Small Quantities of Concrete : When a project has a total plan quantity <br /> of less than 50 yd3 , that concrete will be accepted based on the satisfactory compressive strength <br /> of the QC cylinders . Provide certification to the Engineer that the concrete was batched and <br /> placed in accordance with the Contract Documents . Submit a quality control plan for the <br /> concrete placement operation in accordance with Section 105 . In addition, the Engineer may <br /> conduct Independent Verification (IV) testing as identified in 346 - 9 . Evaluate the concrete in <br /> accordance with 346- 10 at the discretion of the Engineer . <br /> - 125 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />