r- <br /> resulting from the following operations : <br /> ( 1 ) Overloaded Equipment as defined 6 . 0 : <br /> (a) Operating on or crossing over completed bridge structures . <br /> (b) Operating on or crossing over partially completed bridge structures . <br /> (2 ) Equipment within legal load limits : <br /> (a) Operating on or crossing over partially completed bridge structures . <br /> (3 ) Construction cranes : <br /> (a) Operating on completed bridge structures . <br /> (b) Operating on partially completed bridge structures . <br /> Any pipe culvert( s) or box culvert( s) qualifying as a bridge under 1 - 3 is excluded <br /> from the requirements above . <br /> A completed bridge structure is a bridge structure in which all elemental <br /> components comprising the load carrying assembly have been completed , assembled , and <br /> connected in their final position . The components to be considered shall also include any related <br /> members transferring load to any bridge structure . <br /> The Specialty Engineer shall determine the effect that equipment loads have on <br /> the bridge structure and develop the procedures for using the loaded equipment without <br /> exceeding the structure ' s design load capacity . <br /> Submit to the Department for approval eight copies of design calculations , layout <br /> drawings , and erection drawings showing how the equipment is to be used so that the bridge <br /> structure will not be overstressed . The Specialty Engineer shall sign and seal one set of the eight <br /> copies of the drawings and the cover sheet of one of the eight copies of the calculations for the <br /> Department ' s Record Set . <br /> SECTION 9 — MEASUREMENT AND PAYMENT <br /> 9 - 1 . 3 Determination of Pay Areas : <br /> 94 . 3 . 1 Final Calculation : When measuring items paid for on the basis of area of <br /> finished work, where the pay quantity is designated to be determined by calculation, the <br /> Engineer will use lengths and widths in the calculations based on the station to station <br /> dimensions shown on the plans ; the station to station dimensions actually constructed within the <br /> limits designated by the Engineer; or the final dimensions measured along the surface of the <br /> completed work within the neat lines shown on the plans or designated by the Engineer . The <br /> Engineer will use the method or combination of methods of measurement that reflect, with <br /> reasonable accuracy, the actual surface area of the finished work as the Engineer determines . <br /> 9 - 1 . 3 . 2 Plan Quantity : When measuring items paid for on the basis of area of <br /> finished work, where the pay quantity is designated to be the plan quantity, the Engineer will <br /> determine the final pay quantity based on the plan quantity subject to the provisions of 9 - 3 . 2 . <br /> Generally, the Engineer will calculate the plan quantity using lengths based on station to station <br /> dimensions and widths based on neat lines shown in the plans . <br /> 9-3 Compensation for Altered Quantities . <br /> 9 - 3 . 1 General : When alteration in plans or quantities of work not requiring a <br /> supplemental agreement as hereinbefore provided for are offered and performed , the Contractor <br /> shall accept payment in full at Contract unit bid prices for the actual quantities of work done , and <br /> - 12 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />