My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- <br /> resulting from the following operations : <br /> ( 1 ) Overloaded Equipment as defined 6 . 0 : <br /> (a) Operating on or crossing over completed bridge structures . <br /> (b) Operating on or crossing over partially completed bridge structures . <br /> (2 ) Equipment within legal load limits : <br /> (a) Operating on or crossing over partially completed bridge structures . <br /> (3 ) Construction cranes : <br /> (a) Operating on completed bridge structures . <br /> (b) Operating on partially completed bridge structures . <br /> Any pipe culvert( s) or box culvert( s) qualifying as a bridge under 1 - 3 is excluded <br /> from the requirements above . <br /> A completed bridge structure is a bridge structure in which all elemental <br /> components comprising the load carrying assembly have been completed , assembled , and <br /> connected in their final position . The components to be considered shall also include any related <br /> members transferring load to any bridge structure . <br /> The Specialty Engineer shall determine the effect that equipment loads have on <br /> the bridge structure and develop the procedures for using the loaded equipment without <br /> exceeding the structure ' s design load capacity . <br /> Submit to the Department for approval eight copies of design calculations , layout <br /> drawings , and erection drawings showing how the equipment is to be used so that the bridge <br /> structure will not be overstressed . The Specialty Engineer shall sign and seal one set of the eight <br /> copies of the drawings and the cover sheet of one of the eight copies of the calculations for the <br /> Department ' s Record Set . <br /> SECTION 9 — MEASUREMENT AND PAYMENT <br /> 9 - 1 . 3 Determination of Pay Areas : <br /> 94 . 3 . 1 Final Calculation : When measuring items paid for on the basis of area of <br /> finished work, where the pay quantity is designated to be determined by calculation, the <br /> Engineer will use lengths and widths in the calculations based on the station to station <br /> dimensions shown on the plans ; the station to station dimensions actually constructed within the <br /> limits designated by the Engineer; or the final dimensions measured along the surface of the <br /> completed work within the neat lines shown on the plans or designated by the Engineer . The <br /> Engineer will use the method or combination of methods of measurement that reflect, with <br /> reasonable accuracy, the actual surface area of the finished work as the Engineer determines . <br /> 9 - 1 . 3 . 2 Plan Quantity : When measuring items paid for on the basis of area of <br /> finished work, where the pay quantity is designated to be the plan quantity, the Engineer will <br /> determine the final pay quantity based on the plan quantity subject to the provisions of 9 - 3 . 2 . <br /> Generally, the Engineer will calculate the plan quantity using lengths based on station to station <br /> dimensions and widths based on neat lines shown in the plans . <br /> 9-3 Compensation for Altered Quantities . <br /> 9 - 3 . 1 General : When alteration in plans or quantities of work not requiring a <br /> supplemental agreement as hereinbefore provided for are offered and performed , the Contractor <br /> shall accept payment in full at Contract unit bid prices for the actual quantities of work done , and <br /> - 12 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.