1. <br /> no allowance will be made for increased expense , loss of expected reimbursement, or loss of i <br /> anticipated profits suffered or claimed by the Contractor, resulting either directly from such <br /> alterations , or indirectly from unbalanced allocation among the Contract items of overhead <br /> expense on the part of the bidder and subsequent loss of expected reimbursement therefore , or <br /> from any other cause . <br /> Compensation for alterations in plans or quantities of work requiring <br /> supplemental agreements shall be stipulated in such agreement, except when the Contractor <br /> proceeds with the work without change of price being agreed upon , the Contractor shall be paid <br /> for such increased or decreased quantities at the Contract unit prices bid in the Proposal for the <br /> items of work . If no Contract unit price is provided in the Contract , and the parties cannot agree <br /> as to a price for the work, the Contractor agrees to do the work in accordance with 4 - 3 . 2 . <br /> 9 - 3 . 2 Payment Based on Plan Quantity : <br /> 9 - 3 . 2 . 1 Error in Plan Quantity : As used in this Article , the term " substantial error" <br /> is defined as the smaller of (a) or (b) below : <br /> (a) a difference between the original plan quantity and final quantity of <br /> more than 5 % , <br /> (b) a change in quantity which causes a change in the amount payable of <br /> more than $ 5 , 000 . <br /> On multiple job Contracts , changes made to an individual pay item due to <br /> substantial errors will be based on the entire Contract quantity for that pay item . <br /> Where the pay quantity for any item is designated to be the original plan <br /> quantity, the Department will revise such quantity only in the event that the Department <br /> determines it is in substantial error. In general , the Department will determine such revisions by <br /> final measurement, plan calculations , or both , as additions to or deductions from plan quantities . <br /> In the event that either the Department or the Contractor contends that the <br /> plan quantity for any item is in error and additional or less compensation is thereby due , the <br /> claimant shall submit , at their own expense , evidence of such in the form of acceptable and <br /> verifiable measurements or calculations . The Department will not revise the plan quantity solely <br /> on the basis of a particular method of construction that the Contractor selects . For earthwork <br /> items , the claimant must note any differences in the original ground surfaces from that shown in <br /> the original plan cross - sections that would result in a substantial error to the plan quantity, and <br /> must be properly documented by appropriate verifiable level notes , acceptable to both the <br /> Contractor and the Department, prior to disturbance of the original ground surface by <br /> construction operations . The claimant shall support any claim based upon a substantial error for <br /> differences in the original ground surface by documentation as provided above . <br /> 9 - 3 . 2 . 2 Authorized Changes in Limits of Work : Where the Department designates <br /> the pay quantity for any item to be the original plan quantity and authorizes a plan change which <br /> results in an increase or decrease in the quantity of that item, the Department will revise the plan <br /> quantity accordingly. In general , the Department will determine such revisions by final <br /> measurement, plan calculations or both . <br /> 9 - 3 . 2 . 3 Specified Adjustments to Pay Quantities : Do not apply the limitations <br /> specified in 9 - 3 . 2 . 1 and 9 - 3 . 2 . 2 to the following : <br /> ( 1 ) Where these Specifications or Special Provisions provide that the <br /> Department determines the pay quantity for an item on the basis of area of finished work <br /> adjusted in accordance with the ratio of measured thickness to nominal thickness . <br /> - 13 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />