My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2 ) Where these Specifications provide for a deduction due to test results <br /> falling outside of the allowable specified tolerances . <br /> (3 ) To payment for extra length fence posts , as specified in 550 - 6 . 3 . <br /> 9 - 3 . 3 Lump Sum Quantities : <br /> 9 -3 . 3 . 1 Error in Lump Sum Quantity : Where the Department designates the pay <br /> quantity for an item to be a lump sum and the plans show an estimated quantity, the Department <br /> will adjust the lump sum compensation only in the event that either the Contractor submits <br /> satisfactory evidence or the Department determines and furnishes satisfactory evidence that the <br /> lump sum quantity shown is in substantial error as defined in 9 -3 . 2 . 1 . <br /> MAINTENANCE OF TRAFFIC . <br /> (REV 10440) ( 141 ) <br /> SUBARTICLE 102 - 13 . 12 . 1 ( of the Supplemental Specifications) is deleted and the <br /> following substituted : <br /> 10243 . 12 . 1 Redirective : Price and payment will be full compensation for <br /> furnishing , installing, maintaining and subsequently removing such crash cushions . Payment for <br /> restoring damaged crash cushions will be the manufacturer ' s/distributor ' s invoice price for the <br /> new materials/parts plus 20 % markup . The 20 % markup is compensation for all necessary work, <br /> including but not limited to labor, equipment, supplies and profit, as authorized by the Engineer. <br /> Additional MOT required for the repair of the crash cushion will be paid for under the <br /> appropriate MOT pay item . <br /> EXCAVATION AND EMBANKMENT — ACCEPTANCE PROGRAM. <br /> (REV 946-09) (FA 11 -9-09) (740 ) <br /> SUBRTICLE 120 - 10 . 3 . 1 (of the Supplemental Specifications ) is deleted and the <br /> following substituted : <br /> 12040 .3 . 1 Frequency : Conduct QC sampling and testing at a minimum <br /> frequency listed in the table below . The Engineer will perform Verification sampling and tests at <br /> a minimum frequency listed in the table below . <br /> - 14 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.