My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Verification of <br /> Shoulder Only Areas , <br /> Test Name Quality Control Verification Bike/ Shared Use Paths , <br /> and Sidewalks <br /> Standard Proctor One per soil type One per soil type One per soil type <br /> Maximum Density <br /> One per eight LOTs an <br /> Density One per LOT for wet conditions , the One per two LOTS <br /> first lift not affected by <br /> water <br /> One per Standard One per Standard One per Standard <br /> Soil Classification Proctor Maximum Proctor Maximum Proctor Maximum <br /> Density Density Density <br /> EXCAVATION FOR STRUCTURES AND PIPE — ACCEPTANCE PROGRAM. <br /> (REV 946-09) (FA 11 -9 - 09) (740) <br /> SUBARTICLE 125 - 9 . 3 . 1 (Page 188 ) is deleted and the following substituted : <br /> 125-9 .3 . 1 Frequency : Conduct QC Standard Proctor maximum density sampling <br /> and testing at a minimum frequency of one test per soil type . The Verification test will be at a <br /> minimum of one test per soil type : <br /> Test Name Quality Control Verification <br /> Standard Proctor One per soil type One per soil type <br /> Maximum Density <br /> One per eight LOTs and for wet <br /> Density One per LOT conditions , the first lift not <br /> affected by water <br /> Soil Classification One per Standard Proctor One per Standard Proctor <br /> Maximum density Maximum density <br /> STABILIZING — ACCEPTANCE PROGRAM . <br /> (REV 946-09) (FA 11 -9-09) (740) <br /> SUBARTICLE 1604 . 2 . 4 (Page 199 ) is deleted and the following substituted : <br /> 160-4 . 2 . 4 Frequency : Conduct QC sampling and testing at a minimum frequency <br /> listed in the table below . The Engineer will perform Verification sampling and tests at a <br /> minimum frequency listed in the table below . <br /> - 15 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.