My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> f <br /> 31 <br /> I It <br /> b <br /> — Le I 1v <br /> t ,. I dA, 414 <br /> , ; , — .k I%v11 <br /> I�q .. It -It <br /> component construction . Perform all Quality Control Testing using Construction Training and <br /> Qualification Program (CTQP) qualified testing personnel . Perform compressive strength testing <br /> in a laboratory inspected by the Cement and Concrete Reference Laboratory (CCRL) or <br /> Construction Materials Engineering Council (CMEC) , with all deficiencies corrected . <br /> Ensure that each panel and post is permanently and clearly marked by ink stamping the <br /> tongue and groove portion of the panel and post . Mark the panel with the panel type, date cast, <br /> project number, manufacturer ' s name or symbol and the post with the date cast, project number <br /> and manufacturer ' s name or symbol . <br /> 5344 Approved Proprietary Sound Barrier Panels and Systems . <br /> Proprietary panels or systems listed on the QPL that have been pre -determined by the <br /> Engineer to be in compliance with the project design and aesthetic criteria shown in the Plans <br /> may be used. <br /> Manufacturers seeking evaluation of products for inclusion on the QPL must submit an <br /> application in accordance with Section 6 , independently certified test reports , and written <br /> certification that the product meets the requirements of this Section, Design Standards Index <br /> Nos . 5200 thru 5207 , and the Sound Barrier Evaluation Criteria contained in the State Structures <br /> Design Office ' s Structures Manual . <br /> Provide written certification from the manufacturer of the panels that the product meets <br /> the requirements of this Section and is the same product listed on the QPL. <br /> 534-5 Shop Drawing Submittal. <br /> Do not include shop drawings of the basic panel details , submit only the information <br /> requested. Submit shop drawings in accordance with Section 5 , showing a plan and elevation of <br /> the sound walls with the following project specific information provided : <br /> 1 . Begin and end wall stations with offsets <br /> 2 . Horizontal and vertical alignments of the wall <br /> 3 . Fire hose access hole locations <br /> 4 . Drainage panel locations and type <br /> 5 . Graphic details and graphic panel location <br /> 6 . Panel locations <br /> 7 . Post locations <br /> 8 . Elevations of top of panel , bottom of panel, and panel joints <br /> 9 . Existing and proposed ground elevations <br /> 10 . Utility locations <br /> 11 . Special post and panel details <br /> 12 . Post and pile connection details <br /> 13 . Post Cap Details <br /> 14 . Lifting devices <br /> 5341mmmm6 Construction Methods . <br /> A. Prior to beginning earthwork on the project, stake the wall location in the field, and <br /> establish the final ground line elevations at the base of the walls . Use these elevations to develop <br /> the shop drawings , including a complete elevation view of each wall indicating top and bottom <br /> elevations as well as the roadway grade . Protect the final ground elevations established in the <br /> field for the duration of the project, and do not adjust without prior approval of the Engineer . <br /> - 152 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.