2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ell I <br /> Keep to a minimum the clearing and grubbing, and trimming of trees as necessary to construct <br /> the walls . <br /> B . Do not mix wall types or colors at any one site . Install the walls in accordance with the <br /> Plans , and in accordance with shop drawings submitted to and approved by the Engineer. Secure <br /> joints and connections in such a manner as to be structurally sound and without visible openings <br /> in the system allowing sound transmission . Ensure metal walls do not produce a secondary 1 <br /> source of noise transmission due to vibration . <br /> C . Repair marred, chipped, scratched, or spalled areas of walls at no expense to the <br /> Department in accordance with the manufacturer ' s recommendations or at the Engineer ' s <br /> direction . <br /> D . The Contractor may substitute welded for fixed bolt connections or vice versa on ° <br /> metal walls , where applicable, provided load calculations are submitted for the specific modified <br /> connection and uses a minimum safety factor of 3 . 0 . <br /> E . Place trench backfill for wall construction in accordance with 125 - 8 . Use select <br /> materials for the trench backfill . <br /> If, in the opinion of the Engineer, the trench is too narrow to compact, backfill the <br /> trench excavation with flowable fill meeting the requirements of Section 121 or concrete meeting <br /> the requirements of Section 346 or 347 to the satisfaction of the Engineer at no expense to the Li <br /> Department . <br /> F . Dispose of all excess excavation in a manner satisfactory to the Engineer. <br /> G . Keep right-of-way fence that is scheduled to be salvaged in place until completing the <br /> p. <br /> wall or, in the opinion of the Engineer, as long as possible . . <br /> H . After erecting the wall, leave the disturbed area in a finished condition at the direction k <br /> of the Engineer, and grass or sod the area as indicated in the Plans . <br /> I . Erection Tolerances : <br /> 1 . Variation from plumb : plus or minus 1 /4 inch/ post height <br /> 2 . Panel alignment : plus or minus 1 /4 inch <br /> 3 . Top of panel elevation : plus or minus3 /4 inch <br /> 4 . Elevation difference of adjacent panels : plus or minus 1 /2 inch <br /> 5 . Joint taper over panel length : plus or minus 1 /2 inch <br /> 6 . Top of collar elevation : plus or minus3 /4 inch <br /> 7 . Post placement : <br /> a. Variation from specified location plus or minus 1 /2 inch " <br /> b . variation from specified elevation plus or minus 1 /4 inch <br /> 8 . Continuity of graphics , fracture fins , etc across joints : 1 /4 inch <br /> J . When building sound barriers on top of earth berms , construct the berms of fill material <br /> compacted to 95 % of the maximum density as determined by AASHTO T 99 . re <br /> K. Provide the concrete wall (Precast or Cast-in- Place) with a uniform color, pattern , and <br /> texture . <br /> 534-7 Test Wall. 1 <br /> Erect a test wall section not less than 50 feet in length before starting general wall <br /> construction at the project site . The Engineer will use the erection of the test wall to determine if <br /> the Contractor ' s methods and equipment are sufficient to produce a sound barrier that meets the <br /> requirements of the Contract Documents . The Contractor may revise his methods and equipment <br /> as necessary , at any time during the positioning of the test wall, in order to satisfactorily meet all E <br /> - 153 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> P <br /> I lee <br />