Laserfiche WebLink
MON <br /> Iq IN <br /> IN I el k <br /> IN <br /> IN I N IN <br /> V' IV IN I <br /> rIN I ; �x', , . ,4 ;. Aell <br /> Vy <br /> Contract requirements . Build the test wall at a permanent wall location, as directed by the <br /> Engineer. If the test wall does not meet the construction tolerances , remove and dispose of it at <br /> no expense to the Department . Include the cost of the test wall in the cost of the sound barrier. <br /> 534-8 Repairs or Rejection. <br /> For precast concrete sound barrier components that have not been installed, evaluate <br /> cracks , spalls and other deficiencies in accordance with 450 - 12 . Repair deficiencies in <br /> accordance with 450- 13 or the plant ' s approved repair methods that are included as part of the <br /> QCP . Ensure that the original performance and durability of repaired sound barrier components <br /> are maintained. Use materials for concrete repair that will meet or exceed the strength <br /> requirement for the class of concrete used . Materials meeting the requirements of Section 930 <br /> may be substituted for non- shrink grout when required by 450 - 13 . Precast concrete sound barrier <br /> components are subject to rejection if they fail to conform to any of the requirements after repair . <br /> For precast concrete sound barrier components that have been installed, the disposition of <br /> concrete cracks shall be in accordance with 400 -21 . <br /> 534-9 Method of Measurement. <br /> The quantity to be paid for will be the plan quantity, in square feet, measured in place , <br /> IV <br /> completed and accepted, of the area bounded by the top of the top panel and the bottom of the <br /> bottom panel without deductions for openings in the panels , and the beginning to end limits <br /> shown in the control drawings . <br /> 53440 Basis of Payment. <br /> Price and payment will be full compensation for all work specified in this Section, <br /> including but not limited to : furnishing all materials , labor, panels , special panels , posts , post <br /> IV <br /> caps , collars , . reinforcing steel, foundations, drain holes , fire hose access holes , grating, neoprene <br /> pads , equipment, alignment pins , etc . necessary to construct the sound barriers . Include in this <br /> price , the cost of any charges for power stoppages , sound barrier wall realignments , special <br /> erection methods , etc . required to construct the wall . <br /> Payment will be made under : <br /> Item No . 534 - 72 - Sound Barrier - per square foot. <br /> 536 GUARDRAIL . <br /> (REV 6-940) (FA 74640) (141 ) <br /> SUBARTICLE 536-2 . 4 (Page 674 ) is deleted and the following substituted : <br /> 536-2 . 4 Offset Blocks : Use guardrail offset blocks of either timber, steel , recycled <br /> plastic , or rubber, and of the sizes specified in the Design Standards . <br /> Treat timber blocks in accordance with the requirements for posts in 955 - 5 . 3 . <br /> Ensure that penetration of preservative is in accordance with requirements for round piles and <br /> fence posts in 955 -6 . 2 . For timber offset blocks , meet the requirements of the latest edition of the <br /> Southern Pine Inspection Bureau ' s Standard Grading Rules for Southern Pine Lumber, for No . l <br /> grade timber. Dress all timber offset blocks on all four sides ( S4S ) . Ensure that timber offset <br /> blocks do not vary more than 0 . 25 inch from the specified length . <br /> - 154 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />