My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sieve Size Percent Passing <br /> 3 1 /2 inches 100 <br /> No . 200 042 <br /> 548-2 . 6.3 Flowable Fill : Meet the requirements of Section 121 except as noted <br /> within this Section and the plans . <br /> SUBARTICLE 548 - 6 . 5 (Page 686) is deleted and the following substituted : <br /> 548-6. 5 Backfill Placement : <br /> 548-6 .5 . 1 Compacted Select Backfill : Perform work in accordance with an <br /> approved Quality Control Plan (QCP) meeting the requirements of 105 -3 . A LOT is defined as a <br /> single lift of finished embankment not to exceed 500 feet in length . Isolated compaction <br /> operations will be considered as separate LOTs . For multiple phase construction, a LOT will not <br /> extend beyond the limits of the phase . <br /> Place the backfill closely following the erection of each course of precast <br /> components or soil reinforcement layers and spread by moving the machinery parallel to the wall <br /> face . Do not allow equipment heavier than 8 tons closer than 3 feet behind the wall face . Place <br /> backfill in a manner to avoid any damage or disturbance to the wall materials or misalignment of <br /> the facing materials . Remove and replace any wall materials which become damaged or <br /> disturbed during backfill placement at no cost to the Department, or correct as directed by the <br /> Engineer. Remove and reconstruct any misalignment or distortion of the wall facing due to <br /> placement of backfill outside the limits of this specification at no cost to the Department. <br /> Sheepfoot, grid rollers or other types of equipment employing a foot are <br /> not allowed . Achieve compaction within 3 feet of the back of the wall face using a power <br /> operated roller or plate weighing less than 1 , 000 lbs . At a distance greater than 3 feet from the <br /> back of the wall, a vibratory roller may be used, provided that the frequency and amplitude <br /> combined with bulk weight of the roller has performed satisfactorily at a trial section of the same <br /> type of wall . A smooth wheel or rubber tire roller is considered adequate . Ensure that the <br /> maximum lift thickness after compaction does not exceed 6 inches . Decrease the lift thickness if <br /> necessary, to obtain specified density. <br /> Perform backfill compaction in a way that the compactor moves in a <br /> direction parallel to the wall face and proceeds from a distance not less than 3 feet behind the <br /> wall face toward the end of the soil reinforcement element. <br /> Ensure that the moisture content of the backfill material prior to and <br /> during compaction is uniformly distributed throughout each layer of material . Use backfill <br /> material having a placement moisture content at the dry side of the Optimum Moisture content. <br /> To achieve the required compaction moisture content, use water that meets the requirements of <br /> Section 923 . Do not use saltwater. Do not transport excessively moist backfill materials to the <br /> site for any reason . The Engineer will determine the Optimum Moisture Content in accordance <br /> with FM 5 - 521 . <br /> At the end of each day ' s operation, shape the last level of backfill to <br /> permit runoff of rainwater away from the wall face or provide a positive means of controlling run <br /> off away from the wall such as temporary pipe , etc . <br /> 548-6 .5 . 2 Flowable Fill : Perform work in accordance with an approved Quality <br /> 459 - <br /> FPID ( S ) : 4231864 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.