My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN <br /> IN <br /> IN <br /> � Z-� <br /> condition after pick-up at no cost to the Department, until either final acceptance or the <br /> equipment is returned to the Department . <br /> 608 GUARANTIES FOR TRAFFIC CONTROL SIGNALS AND DEVICES . <br /> (REV 1 -2040) (FA 1 -2840) (740) <br /> SECTION 608 (Page 730) is deleted and the following substituted : <br /> SECTION 608 <br /> GUARANTIES FOR TRAFFIC CONTROL SIGNALS AND DEVICES <br /> IN <br /> IN 6084 Description . <br /> This Section sets forth guaranty requirements for traffic control signals and devices <br /> furnished to the Department. The Department will consider manufacturer and Contractor costs <br /> associated with providing and delivering equipment guaranties , requirements , terms , and <br /> conditions incidental to the payment for equipment or construction feature utilizing the <br /> equipment. <br /> 608-2 Guaranty Provisions . <br /> 608-2 . 1 Contractor ' s Responsibility : Secure all guaranties that are customarily issued <br /> by the equipment manufacturer for the specific equipment included in the Contract. Ensure that <br /> all manufacturers ' warranties are fully transferable to the Department and meet or exceed the <br /> Department ' s minimum warranty requirements for the equipment. The Contractor shall ensure <br /> that the form in which such guaranties are delivered to the Contractor includes the provision that <br /> they are subject to transfer to the maintaining agency as named by the Department, and is <br /> accompanied by proper validation of such fact. Transfer guaranties at final acceptance of the <br /> work (or equipment) by the Department. <br /> 608-2 .2 Terms : Ensure that the terms of guaranties are stipulated by the manufacturer <br /> when submitting a request to the Department for certification and equipment submittals for <br /> construction projects . Include terms for a specified service performance with provisions for <br /> repair parts and labor, or for replacement. Provisions shall define the equipment " installation <br /> date" as the date for such guaranty to be in effect. For construction projects , the "installation <br /> date" is the first day of equipment "burn-in" . For warehouse purchases , the "installation date" is <br /> the date of visual inspection approval , not to exceed ten days after delivery date . <br /> 608-2 .3 Conditions : When guaranty is available, ensure that a written and signed <br /> guaranty accompanies the manufacturer ' s billing invoice . The Engineer will sign and retain the <br /> original and provide a copy to the maintaining agency and to the manufacturer. If the Contractor <br /> does not comply with the terms• of the guaranty, the Department may suspend the certification . <br /> Comply with additional terms and conditions as stated in purchasing agreements . <br /> 474 - <br /> FPID ( S ) : <br /> 74 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.