My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND <br /> DEVICES . <br /> (REV 6-2240) (FA 7-2640) (141 ) <br /> SECTION 611 (Pages731 — 736) is deleted and the following substituted : <br /> SECTION 611 <br /> ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES <br /> 6114 Description . <br /> This Section sets forth Contract acceptance procedures for installations of traffic control <br /> signals and devices and for equipment purchase contracts . <br /> 611 -2 Acceptance of Traffic Control Signal and Device Installations . <br /> 611 -2 . 1 Partial Acceptance : The Engineer may make inspection for partial acceptance <br /> under the Contract in accordance with 540 of a complete traffic control signal and device <br /> installation upon its completion in accordance with the Contract Documents and at such time that <br /> other parts of the total Contract are at a stage of completion that either require or allow the <br /> installation to operate in a manner which is in accordance with the Contract Documents . Before <br /> inspection for partial acceptance , the Engineer will require the satisfactory completion of all field <br /> tests of completed installations in accordance with the requirements of 6114 . The Engineer will <br /> make inspection for partial acceptance in accordance with 5 - 10 in company with a Contractor's <br /> representative and, when applicable , a representative of the agency designated to accept <br /> maintenance responsibility . <br /> 611 -2 . 2 Final Acceptance : The Engineer will make inspection for final acceptance of <br /> traffic control signal and device installations as part of all work under the Contract in accordance <br /> with 5 - 11 , only after satisfactory completion of all field tests of completed installations in <br /> accordance with the requirements of 611 -4 and on the basis of a comprehensive final field <br /> inspection of all equipment installations . Submit three copies of Form 750 - 010-02 , Submittal <br /> Data — Traffic Control Equipment, to the Engineer . The Engineer will make the final inspection <br /> with a Contractor' s representative and, when applicable, a representative of the agency <br /> designated to accept maintenance responsibility. Transfer warranties and guarantees on <br /> equipment to the Department in accordance with Section 608 . For traffic signal installations , <br /> submit three completed copies of form 700- 010-22 , Final Acceptance of Traffic Signal <br /> Installation( s) and Transfer of Maintenance, to the Engineer. <br /> 611 -2 .3 As-Built Drawings : As a condition precedent to acceptance under 611 -2 . 1 or <br /> 611 -2 . 2 , furnish as-built drawings of all installations in accordance with the following <br /> requirements : <br /> 611 -2 .3 . 1 Submittal Requirements : Submit three sets of as -built plans for <br /> review by the Engineer on reproductions of the original 11 by 17 inch sheets . Record all as -built <br /> information using block lettering or typed text to ensure legibility. Signing and pavement <br /> marking plan sheets may be used instead of signalization plan sheets , if a substantial number of <br /> changes from the original plans must be recorded. ITS as -built plans must include an accurate <br /> table (spreadsheet) that provides the true final location of devices by mile post to three decimal <br /> places , plus an offset dimension given for each above- ground structure . Global positioning <br /> system (GPS ) coordinates can be utilized as supplemental information in the table . Aerial <br /> able to provide supplementary information . The aerials <br /> photographs may be furnished with the t <br /> - 175 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br /> t <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.