Laserfiche WebLink
611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND <br /> DEVICES . <br /> (REV 6-2240) (FA 7-2640) (141 ) <br /> SECTION 611 (Pages731 — 736) is deleted and the following substituted : <br /> SECTION 611 <br /> ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES <br /> 6114 Description . <br /> This Section sets forth Contract acceptance procedures for installations of traffic control <br /> signals and devices and for equipment purchase contracts . <br /> 611 -2 Acceptance of Traffic Control Signal and Device Installations . <br /> 611 -2 . 1 Partial Acceptance : The Engineer may make inspection for partial acceptance <br /> under the Contract in accordance with 540 of a complete traffic control signal and device <br /> installation upon its completion in accordance with the Contract Documents and at such time that <br /> other parts of the total Contract are at a stage of completion that either require or allow the <br /> installation to operate in a manner which is in accordance with the Contract Documents . Before <br /> inspection for partial acceptance , the Engineer will require the satisfactory completion of all field <br /> tests of completed installations in accordance with the requirements of 6114 . The Engineer will <br /> make inspection for partial acceptance in accordance with 5 - 10 in company with a Contractor's <br /> representative and, when applicable , a representative of the agency designated to accept <br /> maintenance responsibility . <br /> 611 -2 . 2 Final Acceptance : The Engineer will make inspection for final acceptance of <br /> traffic control signal and device installations as part of all work under the Contract in accordance <br /> with 5 - 11 , only after satisfactory completion of all field tests of completed installations in <br /> accordance with the requirements of 611 -4 and on the basis of a comprehensive final field <br /> inspection of all equipment installations . Submit three copies of Form 750 - 010-02 , Submittal <br /> Data — Traffic Control Equipment, to the Engineer . The Engineer will make the final inspection <br /> with a Contractor' s representative and, when applicable, a representative of the agency <br /> designated to accept maintenance responsibility. Transfer warranties and guarantees on <br /> equipment to the Department in accordance with Section 608 . For traffic signal installations , <br /> submit three completed copies of form 700- 010-22 , Final Acceptance of Traffic Signal <br /> Installation( s) and Transfer of Maintenance, to the Engineer. <br /> 611 -2 .3 As-Built Drawings : As a condition precedent to acceptance under 611 -2 . 1 or <br /> 611 -2 . 2 , furnish as-built drawings of all installations in accordance with the following <br /> requirements : <br /> 611 -2 .3 . 1 Submittal Requirements : Submit three sets of as -built plans for <br /> review by the Engineer on reproductions of the original 11 by 17 inch sheets . Record all as -built <br /> information using block lettering or typed text to ensure legibility. Signing and pavement <br /> marking plan sheets may be used instead of signalization plan sheets , if a substantial number of <br /> changes from the original plans must be recorded. ITS as -built plans must include an accurate <br /> table (spreadsheet) that provides the true final location of devices by mile post to three decimal <br /> places , plus an offset dimension given for each above- ground structure . Global positioning <br /> system (GPS ) coordinates can be utilized as supplemental information in the table . Aerial <br /> able to provide supplementary information . The aerials <br /> photographs may be furnished with the t <br /> - 175 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br /> t <br /> t <br />