My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . <br /> e OL <br /> 10 O <br /> 611 -5 Contractor ' s Warranty Period for Installations . <br /> 611 -5. 1 General Requirements : After satisfactory completion of all field tests in <br /> accordance with 611 -4 , repair or replace any defective components or work of the installations <br /> for a 90 day period after final acceptance in accordance with 5 - 11 . <br /> 611 -5 . 2 Contractor ' s Responsibilities : During the warranty period, the Contractor is <br /> responsible for the following : <br /> (a) Repair or replacement of equipment that fails to function properly due to <br /> defective materials or workmanship . <br /> (b) Upon notification by the Engineer of a malfunction, restore the equipment to <br /> proper operating condition within 12 hours after notification by the Engineer. <br /> If the Contractor fails to restore the equipment to proper operating condition <br /> within 12 hours after notification, the Engineer has the authority to have the remedial work <br /> performed by other forces . The Contractor is responsible for all incurred costs of the work <br /> performed by other forces . Remedial work performed by other forces does not alter any of the <br /> requirements , responsibilities or obligations of this warranty. <br /> (c) In the event that the equipment does not function or malfunctions due to <br /> defective materials or workmanship , the Contractor is liable for any impairment to the safety of <br /> pedestrian and vehicular traffic resulting from such malfunction . <br /> 611 -5.3 Department' s Responsibilities : During the warranty period, the Department is <br /> ' responsible for the following : <br /> (a) Electrical energy costs which are paid for by the local maintaining agency. <br /> (b) All adjustments , such as timing, necessary for the normal operations of <br /> equipment. <br /> (c) Documentation of the individuals involved and the time of Contractor <br /> notification upon failure or malfunction of equipment. <br /> (d) Repair or replacement of any part of the installation damaged as a result of <br /> natural causes or those resulting from vehicular or pedestrian traffic not associated with <br /> Contractor activities . <br /> 611 -6 Manufacturer ' s Tests and Certifications . <br /> For materials which may not require formal testing, the Engineer reserves the right to <br /> require certifications from the manufacturer of such equipment and material , to the effect that <br /> they meet all Specification requirements , and, in the event of questionable equipment or material, <br /> to require that such material or equipment be tested at no expense to the Department. <br /> The Engineer reserves the right to withhold any payments which may be due ; if the <br /> Engineer determines that the equipment does not meet the Specifications or evaluation criteria . <br /> 6114 Contracts for Purchase of Equipment. <br /> 6114 . 1 Acceptance Tests Required : For each unit of equipment furnished under <br /> purchase contracts (furnish only) , the Engineer will perform the following tests : <br /> (a) Visual inspection within five days after delivery. <br /> (b) Operational tests which determine whether the equipment performs in <br /> accordance with the requirements of the Contract Documents . The Engineer will complete such <br /> tests within 15 days after delivery . If the equipment is listed on the Department ' s Approved <br /> Product List (APL) , the Engineer may verify the APL Certification number in lieu of the <br /> operational tests . <br /> 611 -7. 2 Eligibility for Payment : <br /> - 178 - <br /> FPID (S ) : 4231864 - 58 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.