optimum moisture and neither dry or saturated, and tamp to the extent directed by the Engineer. <br /> The Department may require that the backfilling be done with poured concrete . <br /> Install spread footings which support sign structures overhanging the roadway as <br /> required in 455 -25 through 455 - 37 . <br /> 7004 . 1 .2 Mixing and Placing Concrete : For batching and mixing of concrete <br /> for footings , meet the requirements of Section 346 , except that the Engineer will allow hand <br /> mixing by approved methods where the quantity to be mixed does not exceed 1 /2 yd3 . Use cast- <br /> in-place or precast concrete for the footings . Obtain precast concrete footings from a plant that is <br /> currently on the list of Producers with Accepted Quality Control Programs . Producers seeking <br /> inclusion on the list shall meet the requirements of 105 - 3 . <br /> 700-7. 1 .3 Forms : The Engineer will not require forms when the ground is <br /> sufficiently firm, in which case, sufficiently moisten the adjacent earth to prevent it from <br /> absorbing the moisture from the concrete . Where forms are required and the soil is not moist, <br /> place sufficient water, as directed by the Engineer, in the hole , and pour the concrete as soon as <br /> the water has been absorbed. Place at least 4 inches of loose earth, free from clods or gravel, over <br /> the top of the footing to effect curing. <br /> 7004. 1 .4 Finishing Concrete : Trowel the top of the concrete to a smooth finish . <br /> 7004 . 2 Drilled Shafts : Meet the requirements of Section 455 . <br /> 700-8 Erection of Signs and Sign Supports . <br /> Do not erect overhead sign supports until the concrete strength in the support footing is at <br /> least 2 , 500 psi . Determine concrete strength from tests on a minimum of two test cylinders <br /> sampled and tested in accordance with ASTM C 31 and ASTM C 39 and verifying test results <br /> have been provided to the Engineer. <br /> Erect the signs and sip structures in accordance with the details shown in the plans . The <br /> Contractor may fabricate the structural steel sign trusses in sections that will fit into available <br /> galvanizing vats . Prior to galvanizing, weld the joints as specified in 460 -6 and in accordance <br /> with the details shown in the plans . Re- galvanize damaged parts as specified in Section 562 . <br /> Weld aluminum structures in accordance with 965 -3 . <br /> Attach electronic display signs to the supporting structure in accordance with the <br /> manufacturer ' s recommendations using the mounting hardware provided by the manufacturer. <br /> 700.9 Removal or Relocation of Signs . <br /> Relocation of signs shall consist of removing the existing sign assembly and installing the <br /> sign on a new foundation . <br /> When the plans call for existing ground-mounted signs to be relocated or removed, <br /> immediately remove supports and footings that project more than 6 inches above the ground <br /> surface after removing the sign panel from the assembly. Remove existing footings to a depth at <br /> least 12 inches below the ground surface . The costs will be included in the Contract unit price of <br /> the item to which it is incidental . <br /> Notify the Engineer a minimum of 30 days prior to removal of existing Logo sign <br /> structures . <br /> 70040 Overlay Existing Sign Panels . <br /> Use 0 . 040 inch thick aluminum sheeting for overlays larger than 3 square feet placed on a <br /> sign panel . Replace hex head bolts on the sign surface using stainless steel flat head machine <br /> screws with nuts and lock washers to give a flat surface for the overlay panel . Install the overlay <br /> - 189 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />