My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the original Contract Specifications , design plans (including traffic control plans) or other <br /> Contract Documents and which effect a change in utility work different from that shown in the <br /> utility plans , joint project agreements or utility relocation schedules . <br /> The Department reserves the right to reject any Alternative Traffic Control Plan . Obtain <br /> the Engineer ' s written approval before beginning work using an alternate TCP . The Engineer ' s <br /> written approval is required for all modifications to the TCP . The Engineer will only allow <br /> changes to the TCP in an emergency without the proper documentation . <br /> 102-5 Traffic Control . <br /> 102-5 . 1 Standards : FDOT Design Standards (DS) are the minimum standards for the use <br /> in the development of all traffic control plans . The MUTCD Part VI is the minimum national <br /> standard for traffic control for highway construction, maintenance, and utility operations . Follow <br /> the basic principles and minimum standards contained in these documents for the design, <br /> application , installation, maintenance, and removal of all traffic control devices, warning devices <br /> and barriers which are necessary to protect the public and workers from hazards within the <br /> project limits . <br /> 102-5 .2 Maintenance of Roadway Surfaces : Maintain all lanes that are being used for <br /> the maintenance of traffic , including those on detours and temporary facilities , under all weather <br /> conditions . Keep the lanes reasonably free of dust, potholes and rutting. Provide the lanes with <br /> the drainage facilities necessary to maintain a smooth riding surface under all weather <br /> conditions . <br /> 102-5 .3 Number of Traffic Lanes : Maintain one lane of traffic in each direction . <br /> Maintain two lanes of traffic in each direction at existing four (or more) lane cross roads , where <br /> necessary to avoid undue traffic congestion . Construct each lane used for maintenance of traffic <br /> at least as wide as the traffic lanes existing in the area before commencement of construction . Do <br /> not allow traffic control and warning devices to encroach on lanes used for maintenance of <br /> traffic . <br /> The Engineer may allow the Contractor to restrict traffic to one -way operation for <br /> short periods of time provided that the Contractor employs adequate means of traffic control and <br /> does not unreasonably delay traffic . When a construction activity requires restricting traffic to <br /> one-way operations , locate the flaggers within view of each other when possible . When visual <br /> contact between flaggers is not possible, equip them with 2 -way radios , official, or pilot <br /> vehicle(s) , or use traffic signals . <br /> 102 -5 . 4 Crossings and Intersections : Provide and maintain adequate accommodations <br /> for intersecting and crossing traffic . Do not block or unduly restrict any road or street crossing <br /> the project unless approved by the Engineer. Maintain all existing actuated or traffic responsive <br /> mode signal operations for main and side street movements for the duration of the Contract . <br /> Restore any loss of detection within 12 hours . Use only detection technology listed on the <br /> Department ' s Approved Products List (APL) and approved by the Engineer to restore detection <br /> capabilities . <br /> Before beginning any construction, provide the Engineer a plan for maintaining <br /> detection devices for each intersection and the name(s) and phone numbers of persons that can <br /> be contacted when signal operation malfunctions . <br /> 102 -5 . 5 Access for Residences and Businesses : Provide continuous access to all <br /> residences and all places of business . <br /> -24 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.