My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s� <br /> 102-5 .6 Protection of the Work from Injury by Traffic : Where traffic would be <br /> injurious to a base , surface course , or structure constructed as a part of the work, maintain all <br /> traffic outside the limits of such areas until the potential for injury no longer exists . <br /> 102 -5 . 7 Flagger : Provide trained flaggers in accordance with Section 105 . <br /> 102 -5 . 8 Conflicting Pavement Markings : Where the lane use or where normal vehicle <br /> or pedestrian paths are altered during construction, remove all pavement markings (paint, tape , <br /> thermoplastic , raised pavement markers , etc . ) that will conflict with the adjusted vehicle or <br /> pedestrian paths . Use of paint to cover conflicting pavement markings is prohibited. Remove <br /> conflicting pavement markings using a method that will not damage the surface texture of the <br /> pavement and which will eliminate the previous marking pattern regardless of weather and light <br /> conditions . <br /> Remove all pavement markings that will be in conflict with "next phase of <br /> operation" vehicle pedestrian paths as described above , before opening to vehicle traffic or use <br /> by pedestrians . <br /> Cost for removing conflicting pavement markings (paint, tape, thermoplastic , <br /> raised pavement markers , etc . ) to be included in Maintenance of Traffic , Lump Sum . <br /> 102-5 .9 Vehicle and Equipment Visibility : Equip all pickups and automobiles used on <br /> the project with a minimum of one Class 2 amber or white warning light that meets the Society <br /> of Automotive Engineers Recommended Practice SAE J595 , dated November 1 , 2008 , or <br /> SAE J845 , dated December 1 , 2007 , and incorporated herein by reference . Existing lights that <br /> meet SAE J845 , dated March, 1992 , or SAE J1318 , dated April , 1986 , may be used to its end of <br /> service life . Lights should be unobstructed by ancillary vehicle equipment such as ladders , racks <br /> or booms . If the light is obstructed, additional lights will be required. The lights shall be <br /> operating when a vehicle is in a work area where a potential hazard exists , when operating the <br /> vehicle at less than the average speed for the facility while performing work activities , making <br /> frequent stops or called for in the plans or Design Standards . <br /> Equip all other vehicles and equipment with a minimum of 4 square feet of <br /> retroreflective sheeting or flashing lights . <br /> To avoid distraction to motorists , do not operate the lights on the vehicles or <br /> equipment when the vehicles are outside the clear zone or behind a barrier . <br /> 102-5 . 10 No Waiver of Liability : Conduct operations in such a manner that no undue <br /> hazard results due to the requirements of this Article . The procedures and policies described <br /> herein in no way acts as a waiver of any terms of the liability of the Contractor or his surety. <br /> 102 -6 Detours . <br /> 102-6 . 1 General : Construct and maintain detour facilities wherever it becomes necessary <br /> to divert traffic from any existing roadway or bridge , or wherever construction operations block <br /> the flow of traffic . <br /> 102 -6 .2 Construction : Plan , construct, and maintain detours for the safe passage of <br /> traffic in all conditions of weather. Provide the detour with all facilities necessary to meet this <br /> requirement . <br /> Where the plans call for the Department to furnish detour bridge components , <br /> construct the pile bents in accordance with the plans , unless otherwise authorized by the <br /> Engineer. <br /> Submit a letter with the following : company naive , phone number, office address , <br /> project contact person , project number, detour bridge type , bridge length , span length , location <br /> and usage time frames , to the Engineer at least 30 calendar days before the intended pick-up <br /> - 25 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.