Laserfiche WebLink
a <br /> t� <br /> 105-8 . 11 . 2 Precast Concrete Drainage Structures , Precast Concrete Box <br /> Culvert, Precast Concrete Pipe, Incidental Precast Concrete, and Flexible Pipe <br /> Manufacturing Facilities Quality Control Personnel : <br /> 1054 . 11 .2 . 1 Level I Quality Control Inspectors : Ensure that the Level I <br /> Inspectors have completed a minimum of a 12 -hour, Department approved, Level I QC Inspector <br /> training course in the respective work area. As an exception to this , ensure Flexible Pipe Level I <br /> QC Inspectors have completed a minimum of an 8 -hour, Department approved, Level I QC <br /> Flexible Pipe Inspector training course . For Incidental Precast Concrete, as an alternative to the <br /> completion of the 12-hour training course , the Department will accept QC personnel meeting the <br /> requirements of 105 - 8 . 11 . 2 . 4 . 1 and CTQP Concrete Field Technician level I certification or <br /> Precast/Prestressed Concrete Institute (PCI) Quality Control Technician/Inspector Level II <br /> certification . <br /> 1054 . 11 . 2 . 2 Level II Quality Control Inspectors : Ensure that Level II <br /> Inspectors have completed Department approved Level I QC Inspector training and a minimum <br /> of a 5 -hour, Department approved, Level II QC Inspector training course in the respective work <br /> areas . For Incidental Precast Concrete , as an alternative to the completion of the 5 -hour training <br /> course , the Department will accept CTQP Concrete Field Technician Level II or PCI Quality <br /> Control Level III certifications . <br /> 1054 . 11 . 2 .3 Plant Quality Control Manager : Ensure that QC Manager <br /> has completed Department approved Level II QC Inspector training and has a minimum of 2 <br /> years construction related experience in the specific work area . <br /> 1054 . 11 .2 .4 Additional Requirements for Quality Control Personnel <br /> of Precast Concrete Drainage, Precast Concrete Box Culvert, and Incidental Precast <br /> Concrete Manufacturing Facilities : <br /> 1054 . 11 . 2 .4 . 1 Testing Personnel : Ensure the personnel <br /> performing plastic property tests have ACI Concrete Field Testing Technician -Grade I <br /> certification . Ensure the personnel performing laboratory compressive strength testing have ACI <br /> Concrete Laboratory Testing Technician-Grade 1 certification or ACI Concrete Strength Testing <br /> Technician certification . <br /> 105-8 . 11 . 2 .4 .2 Batch Plant Operator : Ensure the concrete batch <br /> plant operator is qualified as a CTQP Concrete Batch Plant Operator. As an alternative to CTQP <br /> qualification , the Department will accept the completion of a minimum of a 6-hour, Department <br /> approved, Batch Plant Operator training course . <br /> 107 LITTER REMOVAL AND MOWING <br /> (REV 1247-09) (FA 1 -2740) (740) <br /> PAGE 151 . The following new section is added after Section 105 . <br /> SECTION 107 <br /> LITTER REMOVAL AND MOWING <br /> 1074 Description . <br /> Provide pickup , removal and disposal of litter within the project limits , excluding any <br /> areas identified in the plans as landscaping in accordance with Section 580 . Mow turf or <br /> -49 - <br /> FPID ( S ) : 4231864 - 5 & 01 <br />