Laserfiche WebLink
�4kL{ <br /> � L b _ <br /> Protect flowable fill from freezing for a period of 36 hours after placement. <br /> Place flowable fill to the designated fill line without vibration or other means of <br /> compaction . Do not place flowable fill during inclement weather, e . g . rain or ambient <br /> temperatures below 40°F . Take all necessary precautions to prevent any damages caused by the <br /> hydraulic pressure of the fill during placement prior to hardening. Provide the means to confine <br /> the material within the designated space . <br /> 121 -6 Acceptance. <br /> Acceptance of flowable fill will be based on the following documentation and a <br /> minimum temperature of flowable fill at the point of delivery of 50°F . <br /> Furnish a delivery ticket to the Engineer for each load of flowable fill delivered to the <br /> worksite . Ensure that each ticket contains the following information : <br /> ( 1 ) Project designation, <br /> (2) Date , <br /> (3 ) Time , <br /> (4) Class and quantity of flowable fill , <br /> (5 ) Actual batch proportions , <br /> (6) Free moisture content of aggregates , <br /> (7 ) Quantity of water withheld . <br /> 1 11 Leave the fill undisturbed until the material obtains sufficient strength . Sufficient <br /> strength is 35 psi penetration resistance as in using a hand held penetrometer in <br /> accordance with ASTM C-403 . Provide a hand held penetrometer to measure the penetration <br /> resistance of the hardened flowable fill . <br /> 1214 Basis of Payment. <br /> When the item of flowable fill is included in the Contract, payment will be made at the <br /> Contract unit price per cubic yard. Such price and payment will include all cost of the mixture , in <br /> place and accepted, determined as specified above . No measurement and payment will be made <br /> for material placed outside the neat line limits or outside the adjusted limits , or for unused or <br /> wasted material . <br /> Payment will be made under: <br /> Item No . 121 - 70- Flowable Fill - per cubic yard. <br /> 125 EXCAVATION FOR STRUCTURES AND PIPE — ACCEPTANCE PROGRAM. <br /> (REV 6-349) (FA 843 -09) (1 - 10) <br /> SUBARTICLE 125 -9 . 1 (Page 187 ) is deleted and the following substituted : <br /> 125-9 . 1 General Requirements : Meet the requirements of 120 - 10 , except replace the <br /> requirements of 120- 10 . 1 . 6 with 125 - 9 . 1 . 1 , 120- 10 . 2 with 125 - 9 . 2 , 120 - 10 . 3 with 125 - 9 . 3 , <br /> and <br /> 120 - 10 . 4 with 12540 . <br /> 125-9 . 1 . 1 Reduced Testing Frequency : When no Resolution testing is required <br /> for 6 consecutive LOTs , or if required, the Quality Control test data was upheld, reduce the <br /> Quality Control density testing to one test every two Lots by identifying the substantiating tests <br /> I <br /> n the Density Log Book and notifying the Engineer in writing prior to starting reduced <br /> - 57 - <br /> FPID ( S ) : 423186 - 1 - 5 8 - 01 <br />